Loading...
HomeMy WebLinkAboutEHPR-05-2022-41184.TIF $A �G THIS IS NOT A PERMIT Case# EHPR-05-2022-41184 t „ n CATAWBA COUNTY HEALTH DEPARTMENT PLAN REVIEW APPLICATION FOR ENVIRONMENTAL SERVICES /8 2 sM Environmental Health Plan Review-OSWP IMPROVEMENT 2) -) ACitaft 6ilee tiv& Owner JARROD&SHANON ADAMS,7839 SAWGRASS LN,SHERRILLS FORD NC 28673-9422 H:7049964243 C:7049963758 HOME:7049964243 SHANON@ADAMSINVESTING.COM NAME TO APPEAR ON PERMIT Jarrod & Shanon Adams SITE ADDRESS: 1657 BROWN CHAPEL RD,CATAWBA NC 28609 PIN# 470001098048 NAME of SUBDIVISION: Lot# 2 Section/Block PROPERTY SIZE: Square Feet 43,560.00�Acr�es 1.0 DIRECTIONS: NC-10,right onto Hudson Chapp d,right onto Brown Chapel Rd,property on the right PRIMARY CONTACT: Owner SEWER TYPE: Septic Tank GALLONS PER DAY: 480 WATER SUPPLY: Private Well DESCRIBE WORK: IP for property subdivision,4 bedroom 60x60 home on a slab SITE INFORMATION Do any of the following apply to the property for which this application is applied? If the answer to any of the questions below is"YES",then supporting documentation is required: Does this site contain any jurisdictional wetlands? No Does this site contain any existing wastewater systems? No Is any of the wastewater going to be generated on the site other than domestic sewage? No Is the site subject to approval by any other public agency? No Are there any easements or right-of-ways on this property? No APPLICATION FOR: New Structure STRUCTURE TYPE: PRIMARY RESIDENCE FACILITY TYPE: House OTHER DESCRIPTION: DESCRIPTION OF EXISTING STRUCTURES ON SITE(IF ANY) DIM EXISTING STRUCTURE: NUMBER OF EXISTING BEDROOMS: #OF OCCUPANTS: 2 PROPOSED CONSTRUCTION NEW STRUCTURE DIM:: 60x60 #OF NEW BEDROOMS:: 4 BASEMENT? No BASEMENT FIXTURES? No PLUMBING REQUIRED? EMPLOYEES PER SHIFT: NUMBER OF SHIFTS: TOTAL EMPLOYEES: SEATING CAPACITY: TOTAL FLOOR SPACE(SQ FT): Desired system types(Improvement Permit or Authorization to Construct): ACCEPTED: ALTERNATIVE: CONVENTIONAL: YES OTHER: INNOVATIVE: ANY: Other described: cL:yq+li+auu OS/22/2022 16:26 Page 1 of3 „to!,: CATAWBA('OUNTY case#41111 EHPR-05-2022-41184 IT(..._.t. 2 Public Health Department Subdivision Q —1 Environmental Health Division PIN# 470001098048 PO Box 389,100-A Southwest Blvd,Newton,NC 28658 s. NAME ON PERMIT: (JARROD&SHANON ADAMS),7839 SAWGRASS LN,SHERRILLS FORD NC 28673-9422 (Jarrod&Shanon Adams) Site Address: 1657 BROWN CHAPEL RD,CATAWBA NC 28609 Property Size: Square Feet 43,560.00 Acres 1.0 Directions: NC-10,right onto Hudson Chapel Rd,right onto Brown Chapel Rd,property on the right Completed applications are valid for a period of 2 years.Improvement Permits are valid:with complete site plan=60 months(5 years);with complete plat =without expiration. An Authorization to Construct will remain valid as long as the Improvement Permit is valid.An Authorization to Construct issued for septic repair is valid for 60 months(5 years).Permits may be revoked if the information on this application/site plan changes or if the intended use for the proposed facility changes. Permits may be revoked if site conditions are altered such that they effect permit conditions or installation requirements I have read this application and certify that the information provided herein is true,complete and correct. Authorized county and state officials are granted right of entry to conduct necessary inspections to determine compliance with applicable laws and rules. I understand that I am solely responsible for the proper identification and labeling of all property lines and corners and making the site accessible so that a complete site evaluation can be performed. The undersigned is the owner of the property or legal agent of the owner. Date: Signature of Applicant or Agent If you need further information or assistance please call 828-465-8270 AREA3 FEENAME DATE FEE AMOUNT Improvement Permit Fee 05/27/2022 $150.00 TOTAL FEES $150.00 FEES ARE NON-REFUNDABLE ONCE A SITE VISIT IS MADE OR WORK ON A PLAN REVIEW HAS COMMENCED SYSTEM REDESIGN AND/OR RETRIP WILL INCUR AN ADDITIONAL CHARGE (SEE FEE SCHEDULE) a,m,1ii:n,.,. 08/22/2022 16:26 Page 2 of 3