Loading...
HomeMy WebLinkAboutAUTH-08-2020-137825.TIF `� CATAWBA COUNTY Case# AUi�I I-08-2020-137825 ti .t. Public Health Departmentimj Subdivision PEBBLE BAY PH 4 ' Environmental Health Division PIN# 369604745045 PO Box 389,25 Government Drive,Newton,NC 28658 LOT# 167 w Site Address: 5123 PELICAN POINT DR, DENVER NC 28037 Name on Permit: DAVID NASPINSKI Property Size: Acres 1.1 Directions: Goose point left pelican point Authorization to Construct Permit Permit Category: New Septic Wastewater Flow: 480 g.p.d. Type of Facility: Primary Residence- Basement? No Basement Plumbing? No Bedrooms: 4 Water Supply: Community Well Maximum Occupants: 8 Soil LTAR: 0.3 g.p.d./ft2 WASTEWATER SYSTEM REQUIREMENTS Proposed Wastewater System: 25% REDUCTION System Classification: IIIB-SYSTEM W/SINGLE EFFLUENT PUMP Septic Tank: New Tank: 1.000 gal Pump Tank 1.000 gal Grease Trap_gal Dosing Volume 182 gal Pump Specs: 37.78 GPM @ 26.9 TDH Pressure Head 2 ft Draw Down 9 in Drainfield: Total Area: 1,200sq ft Total Trench Length: 400 ft Aggregate Depth: in Maximum Trench Depth on Downhill Sidewall: 24 in Minimum Soil Cover: 12 in Minimum Trench Separation: 9 ft on center Number of Drain Lines: 4 Trench Width: 3 ft Distribution: Pressure Manifold Pre Treatment: NONE Pump Required Additional Specifications: *INSTALL RISERS. THE INITIAL SEPTIC DRAINLINES MUST BE REFLAGGED BY SURVEYOR BEBORE INSTALLATION CAN BEGIN. *INSTALL THE WATER LINE AT LEAST 10'FROM ANY PART OF THE SEPTIC SYSTEM OR REPAIR AREA. *DO NOT INSTALL THE POWER LINE IN ANY DESIGANTED SEPTIC DRAINFIELD AREA. See also attached site plan. Landscaping or other site alterations that potentially divert groundwater or surface water toward the septic system, or prevent proper drainage away from the septic system, including the direction of gutter flows or foundation drains, is not approved,and may result in failure to approve the initial system installation,or the suspension/revocation of existing permits. >>>>> Do not install system under wet conditions <<<<< PROPOSED REPAIR Repair System Required? Required Soil LTAR: 0.3 g.p.d./ft2 Proposed System: 50%REDUCTION VERTICAL System Classification: IVA-ANY SYSTEM WITH LPP DISTRIBUTION Pump Required ***** Operator Required .1,1,.nnii 06/24/2022 08:23 epCATAWBA COUNTYCase# AUTH-08-2020-137825 Public Health DepartmentSubdivision PEBBLE BAY PH 4 dEnvironmental Health Division PIN# 369604745045 PO Box 389,25 Government Drive,Newton,NC 28658 LOT# 167 Site Address: 5123 PELICAN POINT DR, DENVER NC 28037 Name on Permit: DAVID NASPINSKI Property Size: Acres 1.1 Directions: Goose point left pelican point The issuance of this permit by the Health Department does not guarantee the issuance of other permits. It is the responsibility of the applicant /property owner to insure that all Catawba County Planning/Zoning and Building Inspections requirements are met. This Authorization to Construct Permit is subject to revocation if the site plan,plat or the intended use changes,or if site conditions are altered. The Authorization to Construct Permit is not affected by a change in ownership of the property. This permit was issued in compliance with the provisions of the North Carolina'Laws and Rulesfor Sewage Treatment and Disposal Systems' (15A NCAC 18A.1900). Neither Catawba County nor the Environmental Health Specialist warrants that the septic tank system will continue to function satisfactorily for any given period of time. Any permit issued for a conventional system may be used for an accepted system without Environmental Health authorization or permit modification.Please notify Environmental Health of this change prior to system installation. #4....4---e---,-- /- /cfs:? ___ 08/31/2020 Authorized State Agent Permit Issuance Date 8/31/2025 Permit Expiration Date No grading or construction activity is allowed in areas designated for system and repair without approval of the Health Department. chpemut 06/24/2022 08:23