Loading...
HomeMy WebLinkAboutResurrection Catherdral Church 8-11-10.pdf SEDIMENTATION INSPECTION REPORT CATAWBA COUNTY UTILITIES & ENGINEERING DEPARTMENT PO Box 389, Newton, NC 28658 (828) 465-8161 FAX (828) 465-8392 IN VIOLATION Yes IN COMPLIANCE Project Resurrection Catherdral Project Number Case-7-10-1936 Person Financially Responsible Gene Howell Address PO Box 1860, Lenoir, NC 28645-1860 1. Project Location 318 Herman Sipe Rd, Conover, NC 28613 Pictures: Prints Slides Digital Video 2. Weather and Soil Conditions Hot, workable 3. Is site currently under notice of violation? Yes No If no, check violations below: 5. Violations (refer to Catawba County Local Ordinance Chapter 31): a. No approved plan 31-4 ( c ) g. Inadequate buffer zone 31-5 (a) (1) b. Failure to follow approved plan 31-5 (f) h. Graded slopes and fills too steep 31-5 (b) c. Failure to submit revised plan 31-6 (m) i. Unprotected exposed slopes 31-5 (b) d. Failure to provide adequate groundcover 31-5 (d) j. Failure to maintain erosion control measures 31-13 e. Insufficient measures to retain sediment on site 31-7 (e) k. Notice of activity initiation 31-6 (j) f. Failure to take all reasonable measures 31-4 (d) l. Other (describe): 6. Phase of Grading a. rough grading complete b. final grading complete Description: 7. Potential NPDES Permit violation? Yes No Describe 8. Has sedimentation damage occurred? Yes If yes, where? (check all that apply) No Lake/natural watercourse on the tract Lake/natural watercourse off the tract Other property Road/walkway Description: Degree of damage: Slight Moderate Severe 9. Contact made with (name)Vincent Isenhour Title Grader Inspection report in case file due to no activity given or sent to Person Financially Responsible. Date given/sent: 10. Corrective actions needed: Submit an adequate sedimentation and erosion control plan for approval, covering all areas disturbed or to be disturbed. Submit a revised sedimentation and erosion control plan for approval for the following areas: Install all sedimentation and erosion control measures as shown on the approved plan, including but not not limited to the following locations: Install temporary sediment traps, basins and rock dams and associated diversions as shown on the approved plan, including but not limited to the following locations: Install erosion and sediment control devices sufficient to retain sediment on the tract: Install adequate drop inlet protection as shown on the approved plan, including but not limited to the following locations: Provide adequate temporary or permanent ground cover on all graded slopes where rough or fine grading has been completed for 21 calendar days, including the following areas: Provide adequate permanent ground cover on all areas where development has been completed for 15 working or 90 calendar days, whichever is shorter (15 working or 60 calendar days, whichever is shorter, in High Quality Waters): Maintain all sedimentation and erosion control measures as specified in the approved plan and as required to prevent sedimentation damage including the following locations: 11. Comments: I met with Vincent Isenhour, Carroll Williams, and 2 people from the church. We discussed all the areas that need to be addressed. Vincent has already dipped out all the ponds and needs to install the baffels back in the lower one beside the main road. They are going to install slope drains and install a rock channel at the entrance. They are meeting with the City of Conover to discuss the water line into the building. Once the water line is installed and the power they will install the stone base for the driveway. No activity since last inspection: Report by: Kim Sue Others present: Carroll Williams, Two from the church Date of inspection: 8-11-10 Time arriving at site: Time leaving site: cc: , ,