Loading...
HomeMy WebLinkAboutCBPR-6-10-6122 Plan Review Comments 07-30-10.tif CBSA Architects Architecture ■ Planning ■ Interior Design P 0 Box 1239 I Hickory, North Carolina 28603 I (828) 322-3403 July 30, 2010 Jeffrey N. Hinkle Code Official, Field Supervisor Catawba County Building Services Hickory Permit Center 612 76 North Center Street �,/I l p Hickory, NC 28601 RE: Catawba County Schools Harry M. Arndt Middle — Gymnasium Addition Dear Jeff, Thank you for your review and your staffs' review of this project on July 23, 2010. Enclosed with this response letter is 7 sets of the revised architectural drawings. Demolition is scheduled to start tomorrow, July 27 In response to the comments I have the following: 1) All items have been responded to. 2) For further code official requirements please contact me or Ernie Sills, AIA, LEED AP 3) All provisions of the technical codes, pertinent laws and ordinances will be complied with. 4) See specifications for testing laboratory requirements. 5) Provisions have been made to keep students and staff away from the construction area and the students and staff will not start using the new facility until a certificate of occupancy is obtained. 6) Interior finishes will comply with table 803.5. see notes on sheet A2.0. 7) Adequacy of egress lighting and exit signage will be verified in the field. 8) Fireblocking and Draftstoping will be installed as necessary. 9) The existing toilet rooms and locker rooms will not be renovated as part of this project. 10) There will not be any indirect waste piping on this project. 11) See attached "Special Inspection Documents ". 12) Addendum items have been incorporated into the 24" x 36 ", see attached revised Architectural, Civil, Structural, Mechanical & Electrical sheets. 13) The ramp has been coordinated with the civil sheet C2, see attached. 14) The note regarding the existing entry canopy to remain has been added to sheet AD1.0 for clarity. 15) The door schedule on sheet A2.0 has been revised to show doors 203A & 204A as rated doors. ` CBSA Architects PAGE 2 16) A note has been added to the plan on sheet A1.0 at the boiler room indicating that the filled in wall will be 2 hour rated. 17) The detail key for section G on A6.1 has been deleted and detail key E has been correctly referenced to sheet A6.1 18) See attached copy of an e-mail from Rick Sain with the Catawba County Schools stating that the owner will provide the required listening devices. 19) Shop drawings of the bleachers will be submitted to your office as soon as they are available. 20) An overflow drain has been shown for the new mechanical room and the adjacent entry roof, see revised sheet A4.0. 21) Roof drains over the main space have been revised to show (4) 4" primary roof drains and (4) 4" overflow drains, see attached roof drainage calculations. 22) Refer to the revised sheet A4.0 that shows the overflow drain over the coaches' office. 23) Details for the entry canopy cover have been incorporated into sheet A6.1, see wall section E and the notes as well as the structural details that show the fastener type, diameter, length and spacing. The notes that were submitted previously have been shown on the details. A letter from the manufacturer on their letter head regarding snow & wind load conformance is attached. A copy of the shop drawings will be submitted to the permitting center for your review when they come to our office. 24) See revised structural sheets that eliminates the bridging to the 2hr wall next to the locker rooms and revises the bearing plate on the other wall. In response to the previous comments from the Catawba County Fire Approval I have the following: 1) No further comments were made, so it is assumed that the previous responses are acceptable. In response to the previous comments from the Hickory Utilities Review I have the following: 1) No further comments were made, so it is assumed that the previous responses are acceptable. See attached Statement of Special Inspections by James Tate, PE. Please let me know if you have any questions or comments. Thank you for your continued assistance with this project. Sincerely, J. Steven Walker, AIA CBSA Architects I cc: Steve Demiter, Assistant Superintendent CCS Rick Sain, Construction Manager CCS Ernie Sills, AIA, LEED AP G:\ 2010 .006 \correspondence \ltleffHinkle 072610.doc !� 1ZOSL XL 'QNN Q1�H111 71��� � >me •oa ao no11s►. °°" S310N 11/2�3N39 N�.YSOdi00 NO@gl SN31fLallfi/Ml 90-9Z- 0T � r Q' `O • y ���VVV z = i W co W W O O� p M l- O 000 n O� a VI O M 00!- O V.M.. 00 p, NCO oo et --.-» t%O 0000 O WN000 VI QOM hMsO VI r- �h!`1O N 00 C-4 -t cc O VI VI N t- 0 0 M .. a,_ WI 0 VI ' d' a 0O l eP 'O M M O +�•. O V10 OO , VINNM�O ----M- W 000+00 �O M.••- O N- �N'l�O It W x--00. --tom 00- -•M000 W ^� a, x s p • ts m y G E m ` q a o .. N m u m U 00 m m 0 �, y A O A �, p•- 0 co as �'ua ° a 3333�= �o ae ce at at o u u° u u o _W U y 4�ac�e�5 5 55z>.7z7 7 0xw � >333 N h N M n 3 M 7 V) W N O V) Q MOOd•. -. C,O O hN Q '� [t 7C4 w.-- 000 Lil OefiN0. �n0M�0 �O n 00 `O O. N 0 C4 C4 OM g, NMOMMO V1O MO"cnrl- On O+MO` V1000 V1 4100 ice.- -. O --M NW N00M O yNenM W 0 01'R � y NMMM W NOO [� 6.N (,7,j �O�N �fY O•--'••-•^+ Q1 IS y P. O Chi d' gel z ° o m at o v, �, a cy p d 3- b 0 'rl .0 N O `" y °C O 0D C w c0 '� r�i. ' ' O,, O cc Z '� = .�6 as 0 7; 7 ... O a q> t. O 0 7 k �.. e3 .k 0 Q N O U Q 2 W W Z z Z Ww4 W O F Z � }} 041 Z 0 • 41 20 < L W J O 1_ OIn02U < MO .� � J�J11 } m 0L �� � a�c��; . Z =0 A d�w <Jw a - , � �J�QO <�� < oe w� g� 3a O 3 W <W <W <O m 06 ?<OJCZ/l�O�j O� Z w 10 0- O W aOZ .E Q F J �aa�N`�a L, (/) N ~ O40 41<ozUw4� HOWU_W MM--- OO Z '.. 0 wF- Y•i..o � l` =O } NOzoo00QZ 3 <- 41O (5z0OOzJ 9 ! - W 1 '1 i 057 m d0 0 Z O ZOQW LIWW�wWzZ�WJ0 O Q 7UW W 1 C - 70W jL y 0 y ?�zm 0- - on z CWL OO Owl= -WZJWD FWU041ZO0O O W Op� V10QQ_'_f -� Jf- -OZZ�3 Z O WUJ <Fs ^ O N W Wmz V) JV,1Z0{nOUj O z 0 < 41�D O =OYO� z0 < -w I�V14)�Z Li od� ~ W=Ni t 050 wmQ2FJ� � N N I w ~ m O woo 0 ZJ 0 0 O�NH ir WWW -17 C3 c�1QC7 ,�N, =��g aW °�z OWI.-I o J o'= o waawzzf �Z,- Q �?ma�Ut�i�?rirr�.rO ° a v Sri =UZaL o Z-6 CBSA Architects Architecture ■ Planning ■ Interior Design P O Box 1239 1 Hickory, North Carolina 28603 I (828) 3 22- 3403 ROOF DRAINAGE CALCULATIONS FOR THE ARNDT MIDDLE SCHOOL GYMNASIUM ADDITION July 27, 2010 As requested by the Catawba County permit plan review of July 22, 2010 item no.21 the roof drainagecalculation is as follows: 1— Per figure 1106.1 100 -year, 1 -hour rainfall (inches /hour) for primary roof drains, Catawba County is 3.5 inches per hour. Per table 1106.2 size of vertical conductors and leaders a 4" drain for a 4" per hour rainfall will serve an area of 4,600 sq. ft. of horizontally projected roof area. 2 — PER FIGURE 1106.1(a) 100 -year , 15- minute rainfall (inches /hour) for secondary roof drains, Catawba County is 6.8 inches per hour. Per table 1106.2 a 4" drain for a 7" per hour rainfall will serve an area of 2,630 sq, ft. of horizontally projected roof area. Extrapolated 6.8" per hour from table 1106.2 the area served by a 4" drain will be 2,718 sq. ft. Main Gymnasium roof area is: 10,411 sq. ft. divided by 4 = 2,602.75 sq. ft. (4) drains required & (4) provided for secondary drainage. 10,411 sq. ft. divided by 3 = 3,470 sq. ft. (3) drains required & (4) drains provided for primary drainage. Boiler Room /Storage Room roof area is 1,302 sq. ft. (1) primary & secondary drain required & provided. Coaches Office is 267 sq. ft. (1) primary & secondary drain required & provided. Entry Roof is 116 sq. ft. (1) primary & secondary drain required & provided. 1 —The area permitted for a 4" horizontal storm pipe @ 1% slope for a 4" per hour rainfall is 1,800 sq. ft. for primary drainage & 1,108 sq. ft. for secondary drainage at 6.8" per hour. G:\ 2010 .006\ correspondence \Itroofdrain72710.doc i CBSA Architects PAGE 2 " 2 — The area permitted for a 6 horizontal storm pipe @ 1% slope for a 4" i p p p p per hour rainfall is 5,350 sq. ft. for primary drainage & 3,146 sq. ft. for secondary drainage at 6.8" per hour. I 3 - The area permitted for a 8" horizontal storm pipe @ 1% slope for a 6.8" per hour rainfall is 6,706 sq. ft. for secondary drainage. The secondary horizontal drain for the boiler room is 6 ". (3,146 sq. ft allowed/ 1,302 sq. ft actual). The secondary horizontal drain for % of the main roof is 6" (3,146 sq. ft. allowed /2,603 sq. ft. actual). f The secondary horizontal drain for % of the main roof is 8" (6,706 sq. ft. allowed/ 5,206 sq. ft. actual). I The primary horizontal drain for Y4 of the main roof is 6" (5,350 sq. ft. allowed/ 2,203 sq. ft actual). The primary horizontal drain for % of the main roof is 6" (5,350 sq. ft. allowed/ 5,203 sq. ft. actual). ( F G:\ 2010.006 \correspondence \Itroofd ra in72710.doc is R F b F Page 1 of 1 Steve Walker r From: Sain, Rick [Rick_Sain @catawbaschools.net] Sent: Friday, July 30, 2010 8:51 AM To: Steve Walker Subject: RE: Arndt Middle School Gymnasium Attachments: Rick Sain.vcf Steve, The Owner will provide assisted listening devices are required by the code. Rick Sain Director of Facilities Management Catawba County Schools From: Steve Walker [mailto:SWalker @cbsa- architects.com] 1 Sent: Sunday, July 25, 2010 7:23 PM To: Sain, Rick Subject: Arndt Middle School Gymnasium Rick: One of the review comments from the Permit Office asks for " Verify that a minimum of 27 assisted listening devices (as per 2009 NCBC Table 1108.2.6.1) will be provided by owner ". Please verify. Thanks J. Steven Walker, AIA CBSA Architects P.O. Box 1239 Hickory, NC 28603 828 - 322 -3403 fx 828 - 322 -1802 All e-mail correspondence to and from this address is subject to the North Carolina Public Records Law, which may result in monitoring and disclosure to third parties, including law enforcement. , it i e a 7/30/2010 I Appendix A Blank Forms Page 1 of 3 CATAWBA COUNTY, NORTH CAROLINA SPECIAL INSPECTIONS PROGRAM Statement of Special Inspections TPI Permit #1: TPI Permit #2: TPI Permit #3 (TPI Permit Numbers to be furnished by CCBSD) PROJECT: 4. M , Arad I � ,�Y � 1 ad. It h0Q I - 4--t, NCBC Edition: 009 2 I Gymnas i urt) i I Address: C- CITO(W C.,O )n +V Occupancy: I { I� Or�1 CArD�1f1A Construction Type: Building Owner: Cnf Cnunij SchooIs Mr, RucK Sain l Name Company Owner's Address: BOX 101Q t l J�or\ N C 28(n58 Architect of Record: E r n asl K. S ) I Is Asfl C, &SA A rchi-I- C +s Name & License Company Structural Engineer of Record: Jam S TQiic PI: 20527 Tay t o r k V_ 1010. f Name & License l _ Company Geotechnical Engineer of Record: ECS C0-roI1r14S LLP F 1078 Name & License Company Special Inspections Engineer of Record 1: F C S Caro 1►naS L L P P-10 Name & License Company Special Inspections Engineer of Record 2: Name &License Company Special Inspections Engineer of Record 3: Name & License Company General Contractor: Re x Lai t La'� I f LAi WeCS Name & License Company This Statement of Special Inspections is submitted as a condition for permit issuance in accordance with the North Carolina Statewide Building Code. The Special Inspections Engineer of Record shall keep records of specified special inspections and testing and shall fumish copies of inspection and testing reports to the Catawba County Building Services Division and to the appropriate registered design professionals of record. Discrepancies from the approved plans and specifications and code violations observed during the conduct of special inspections services shall be brought to the immediate attention of the contractor for correction, to the attention of the Catawba County Building Services Division, and to the appropriate registered design professionals of record. A final report of special inspections documenting completion of specified special inspections and correction of any discrepancies and observed code yiglAtions,noted in the inspection and testing reports shall be submitted to the Catawba County Building Services Division prior to the•a�yttsf for,,.n811 fJauilding inspection and building inspection approval by County staff. Prepared by Registered Design Professional in Responsible Charge: Jam es S I a1 +e P E. (Type or print) Name Signature & Date x v� Building Owner's Authorization: }•,., „`;,,ti Y Signature & Date Building Official's Acceptance: Catawba County Building Services Signature & Date Page 1 f i 1 Appendix A. Blank Foams Page 2 of 3 STATEMENT OF SPECIAL INSPECTIONS Date: PROJECT: Prepared By: z ACTIVITY /SYSTEMS I Y/N AGENT Continuous or Periodic Insptction ref. below Steel Construction, Fabrication & NC Building Code 1704.2, 170, 1707, f Seismic Resistance S� 1708.4 & SICC Cha ter 6 Concrete Construction, Fabrication & t,/ NC Building Code 1704.2, 1704.4, 1708.3 Seismic Resistance 1 o S y SICC Chapter 7& 8 Masonry Construction, Fabrication & `� _ NC Building Code 1704.2, 1704.5, 1708.1 & i Seismic Resistance 1 S i SICC Chapter 9 ! Wood Construction, Fabrication & NC Building Code 1704.2, 1704.6, 1707.3 Seismic Resistance & SICC Chapter 10 Soils _ .5.t 7 NC Buildinq Code 1704.7 & SICC Ch. 11 Pile Foundations & Fabricators NC Building Code 1704.2, 1704.8, 1808, 1809, 1810, 1811 & SICC Section 1104.2 Pier Foundations NC Building Code 1704.9, 1808, 1812 & SICC Section 1104.2 Earth Retention Systems NC Building Code 1806.2 & SICC Ch. 12 Sprayed Fire Resistance Materials N NC Building Code 1704.10 & SICC Ch. 13 Mastic & Intumescent fire- resistant coatings r NC Building Code 1704.11 & SICC Ch. 13 € EIFS /t/ NC Building Code 1704.12 & SICC Ch. 14 ` Smoke Control N NC Building Code 1704.14 & SICC Ch. 15 Seismic Resistance Architectural, NC Building Code 1705.3 para 4.2, 4.3, 4.4, Components N 4.5, &1707.7 & SICC Ch. 16 Seismic Resistance Mechanical NC Building Code 1705.3 para 2- 5, 1707.8, Components 1707.9, 1707.10, & 1708.5 & SICC Ch. 16 Seismic Resistance Electrical NC Building Code 1705.3 para 2- 5, 1707.8, Components 1707.9, 1707. 10, & 1708. 5 & SICC Ch. 16 Structural Observations required in SER NC Building Code 1702 & 1709 To be Occupancy Category III or IV per Table �(/ conducted by the Structural Engineer of 1604.5 Record Special Cases N NC Building Code 1704.13 INSPECTION AGENTS Name, Company, Address 1. Special Inspections Engineer of Record 1: I`CS Carol�nds , LL 2. Inspection and Testing Agency 1 A: 1rCS Co,rol%nas , L1 3. Special Inspections Engineer of Record 2: t� 4. Inspection and Testing Agency 2 A: r�l A I 5. Special Inspections Engineer of Record 3: NR 6. Inspection and Testing Agency 3 A: NA } Note: The inspectors and testing agencies shall be engaged by the owner or the Owners Agent, and not by the Contractor or Subcontractor whose work is to be inspected or tested. Any conflict of interest must be disclosed to the Building Official, prior to commencing work. f Page 2 f i I t i Appendix A Blank Forms Page 3 of 3 CATAWBA COUNTY, NORTH CAROLINA STATEMENT OF SPECIAL INSPECTIONS Identification of Seismic Systems NCBC 1705.3 s rNC ismic Design Cate o I ntification of Seismic Systems Required BC 1705.3 para 1 & 1705.3.1 Description of seismic force resisting system requiring special inspections ew vi Section 1705.3, 1707 and 1708 of the NCBC to prepare this section): f3earIn9 lt.)al1 $ys+em - maSOr,cl Cons�ruck�on Gna S�ruci -uYal S -}ee,� irk occordaaC,& W/ NC . Sec -bon 1- 7. NCBC 1705.3 para 2 & 1705.3.1 Description of designated seismic systems requiring special inspections (Review Section 1705, 1707 and 1708 of the NCBC and ASCE 7 to prepare this section): NCBC 1705.3 para 3, 4, 5 & 1705.3.1 Description of additional seismic systems requiring special inspections (Review Section 1705, 1707 and 1708 of the NCBC and ASCE 7 to prepare this section): F f F E Identification of Wind Force Resisting System 1705.4 I Basic Wind Speed 3 second gust) coo Wind Exposure Catego Identification of MWFR Systems Required Y/N Description of wind force resisting system and designated wind resisting components requiring special inspections (Review Section 1705.4 of the NCBC to prepare this section): I Statement of Responsibility s List each contractor responsible for the construction or fabrication of a system or component designated above. Each contractor listed must submit a Statement of Responsibility. Name Com an System or component L u i c�11 Page 3 i Contractor's Statement of Responsibility Appendix A Blank Forms Each contractor responsible for the construction or fabrication of a system or component designated in the Quality Assurance Plan must submit a Statement of Responsibility. Project: I N. nn.Arn8j m;aale School -nl GyrnrjoS�urh Contractor's Name: f�C Y, Address: t License No.: Description of designated building systems and components included in the Statement of Responsibility: Qeac�n wa ll Sys +em - MCASOnry anSIrueVior) o,nd S +ruc +Ur S }ce in accord ar\Ce LO / N CSbc- 9--Cf10r\- 1 - 7 s i Contractor's Acknowledgment of Special Requirements f i I hereby acknowledge that I have received, read, and understand the Quality Assurance Plan and Special Inspection program. r I hereby acknowledge that control will be exercised to obtain conformance with the construction documents approved by the Building Official. k 4 E Signature Date Contractor's Provisions for Quality Control Procedures for exercising control within the contractor's organization, the method and frequency of reporting and the distribution of reports is attached to this Statement. i z Identification and qualifications of the person(s) exercising such control and their position(s) in the organization are attached to this Statement. i E E I ' • Contractor's Statement of Responsibility • k F Page 4 E