HomeMy WebLinkAboutResurrection Catherdral Church 7-23-10.pdf
SEDIMENTATION INSPECTION REPORT CATAWBA COUNTY UTILITIES & ENGINEERING DEPARTMENT PO Box 389, Newton, NC 28658 (828) 465-8161 FAX (828) 465-8392 IN VIOLATION Yes IN COMPLIANCE Project
Resurrection Catherdral Project Number Case-7-10-1936 Person Financially Responsible Gene Howell Address PO Box 1860, Lenoir, NC 28645-1860 1. Project Location 318 Herman Sipe Rd, Conover,
NC 28613 Pictures: Prints Slides Digital Video 2. Weather and Soil Conditions Hot, workable 3. Is site currently under notice of violation? Yes No If no, check violations below: 5. Violations
(refer to Catawba County Local Ordinance Chapter 31): a. No approved plan 31-4 ( c ) g. Inadequate buffer zone 31-5 (a) (1) b. Failure to follow approved plan 31-5 (f) h. Graded slopes
and fills too steep 31-5 (b) c. Failure to submit revised plan 31-6 (m) i. Unprotected exposed slopes 31-5 (b) d. Failure to provide adequate groundcover 31-5 (d) j. Failure to maintain
erosion control measures 31-13 e. Insufficient measures to retain sediment on site 31-7 (e) k. Notice of activity initiation 31-6 (j) f. Failure to take all reasonable measures 31-4
(d) l. Other (describe): 6. Phase of Grading a. rough grading complete b. final grading complete Description: 7. Potential NPDES Permit violation? Yes No Describe 8. Has sedimentation
damage occurred? Yes If yes, where? (check all that apply) No Lake/natural watercourse on the tract Lake/natural watercourse off the tract Other property Road/walkway Description: Sediment
overflowed the basin along Herman Sipe Rd into the utility easement area. Degree of damage: Slight Moderate Severe 9. Contact made with (name)n/a Title Inspection report in case file
due to no activity given or sent to Person Financially Responsible. Date given/sent: 7-28-10 10. Corrective actions needed: Submit an adequate sedimentation and erosion control plan
for approval, covering all areas disturbed or to be disturbed. Submit a revised sedimentation and erosion control plan for approval for the following areas: Install all sedimentation
and erosion control measures as shown on the approved plan, including but not limited to the following locations: Install temporary sediment traps, basins and rock dams and associated
diversions as shown on the approved plan, including but not limited to the following locations: Install erosion and sediment control devices sufficient to retain sediment on the tract:
Install adequate drop inlet protection as shown on the approved plan, including but not limited to the following locations: Provide adequate temporary or permanent ground cover on all
graded slopes where rough or fine grading has been completed for 21 calendar days, including the following areas: Provide adequate permanent ground cover on all areas where development
has been completed for 15 working or 90 calendar days, whichever is shorter (15 working or 60 calendar days, whichever is shorter, in High Quality Waters): Maintain all sedimentation
and erosion control measures as specified in the approved plan and as required to prevent sedimentation damage including the following locations: All sediment basins need to be cleaned
out, restabalize slope at storm drain pipe across drive, clean sediment out of storm drain pipe, repair all rills and stabalize all exposed slopes, clean all sediment in R/W's along
Herman Sipe Rd and utility easement area. 11. Comments: I can meet someone on site to go over everything. No activity since last inspection: Report by: Kim Sue Others present: Date of
inspection: 7-23-10 Time arriving at site: Time leaving site: