HomeMy WebLinkAboutKey Harbor 24 Jun 2010.docSEDIMENTATION INSPECTION REPORT
CATAWBA COUNTY UTILITIES & ENGINEERING DEPARTMENT
PO Box 389, Newton, NC 28658
(828) 465-8161 FAX (828) 465-8392
Project Key Harbor Project Number ECP 2006-00017
Person Financially Responsible Has yet to be dtetermined ( in Receivership) Caroland Development has been the contact I have been working with to bring the site into compliance.
Address 6130 Harris Technology Blvd, Charlotte, N.C. 28269
1. Project Location Azalea Rd, Sherrills Ford Pictures: Prints Slides Digital Video
2. Weather and Soil Conditions 90's Workable
3. Is site currently under notice of violation? Yes No If no, check violations below:
5. Violations (refer to Catawba County Local Ordinance Chapter 31):
a. No approved plan g. Inadequate buffer zone
b. Failure to follow approved plan h. Graded slopes and fills too steep
c. Failure to submit revised plan i. Unprotected exposed slopes
d. Failure to provide adequate groundcover j. Failure to maintain erosion control measures
e. Insufficient measures to retain sediment on site k. Other (describe): Progress inspection
f. Failure to take all reasonable measures
6. Phase of Grading
a. rough grading complete b. final grading complete
Description:
7. Potential NPDES Permit violation? Yes No Describe
8. Has sedimentation damage occurred? Yes If yes, where? (check all that apply) No
Lake/natural watercourse on the tract Lake/natural watercourse off the tract Other property Road/walkway
Description:
Degree of damage: Slight Moderate Severe
9. Contact made with (name)Wes Honeycutt Title
Inspection report given or sent to Person Financially Responsible. Date given/sent:
10. Corrective actions needed: Many of the areas from the May 6 inspection have been corrected. The only real issue is some ground stabilization on the roads where rills continue to
form.
11. Comments: Overall the site has improved significantly. All major creek crosings and areas closes to the water have been improved and appear to be stable. Caroland Development and
their partnters have done a great job on getting the site into compliance. This site could come to closure with a few more measures and stabilization in areas mentioned above . Wes and
Shep have both been helpful in getting the site stable.
Report by: Ed Barton Others present: Wes Honeycut, Shep
Date of inspection: 24 June 2010 Time arriving at site: 0930 Time leaving site: 1230
cc: , ,