Loading...
HomeMy WebLinkAboutTimbe Ridge Townhomes 23 Mar 2010.docSEDIMENTATION INSPECTION REPORT CATAWBA COUNTY UTILITIES & ENGINEERING DEPARTMENT PO Box 389, Newton, NC 28658 (828) 465-8161 FAX (828) 465-8392 Project Timber Ridge Townhomes Project Number ECP2009-00006 Person Financially Responsible Hedrick Construction Inc. Address PO Box 576, Claremont, NC 28610 1. Project Location 302 Rock Barn Rd NE, Conover Pictures: Prints  Slides  Digital  Video  2. Weather and Soil Conditions Soil wet, not raining, 50's 3. Is site currently under notice of violation?       Yes  No  If no, check violations below: 5. Violations (refer to Catawba County Local Ordinance Chapter 31):  a. No approved plan  g. Inadequate buffer zone  b. Failure to follow approved plan  h. Graded slopes and fills too steep  c. Failure to submit revised plan  i. Unprotected exposed slopes  d. Failure to provide adequate groundcover  j. Failure to maintain erosion control measures e. Insufficient measures to retain sediment on site  k. Other (describe):        f. Failure to take all reasonable measures 6. Phase of Grading a. rough grading complete  b. final grading complete Description:       7. Potential NPDES Permit violation? Yes  No  Describe See below 8. Has sedimentation damage occurred? Yes  If yes, where? (check all that apply) No  Lake/natural watercourse on the tract  Lake/natural watercourse off the tract  Other property  Road/walkway  Description: Sediment has left site outside the rpoerty lines to the SW. Slight sedimentation reached the creek about 600 ft from the edge of the property line. Degree of damage: Slight  Moderate  Severe  9. Contact made with (name)      Title       Inspection report given  or sent  to Person Financially Responsible. Date given/sent: 26 Jan 10 10. Corrective actions needed: CB 3 does not have inlet protection according to plan. TST-2 not installed acording to plan. Outlet of culvert need to have rip rap apron installed. Gravel construction entrance needs to have surge stone. Rock check dams at in let and out let sides need to be reestablished. Check dam Southwest of CB2 needs to be cleaned out and reestablished. Area alonf Rock Barn Rd needs to be estalblised with ground cover. Other measurures might need to be put in to prevent any sediment from leaving site along the slopes and ditch along Rock Barn Road. TST-1 Baffeles not installed. 11. Comments:       Report by: Ed Barton Others present:       Date of inspection: 23 Mar 2010 Time arriving at site: 1320 Time leaving site: 1400 cc:       ,       ,