Loading...
HomeMy WebLinkAboutKey Harbor 24 Jun 2010.docSEDIMENTATION INSPECTION REPORT CATAWBA COUNTY UTILITIES & ENGINEERING DEPARTMENT PO Box 389, Newton, NC 28658 (828) 465-8161 FAX (828) 465-8392 Project Key Harbor Project Number ECP 2006-00017 Person Financially Responsible Has yet to be dtetermined ( in Receivership) Caroland Development has been the contact I have been working with to bring the site into compliance. Address 6130 Harris Technology Blvd, Charlotte, N.C. 28269 1. Project Location Azalea Rd, Sherrills Ford Pictures: Prints  Slides  Digital  Video  2. Weather and Soil Conditions 90's Workable 3. Is site currently under notice of violation?       Yes  No  If no, check violations below: 5. Violations (refer to Catawba County Local Ordinance Chapter 31):  a. No approved plan  g. Inadequate buffer zone  b. Failure to follow approved plan  h. Graded slopes and fills too steep  c. Failure to submit revised plan  i. Unprotected exposed slopes  d. Failure to provide adequate groundcover  j. Failure to maintain erosion control measures e. Insufficient measures to retain sediment on site  k. Other (describe): Progress inspection  f. Failure to take all reasonable measures 6. Phase of Grading a. rough grading complete  b. final grading complete Description:       7. Potential NPDES Permit violation? Yes  No  Describe       8. Has sedimentation damage occurred? Yes  If yes, where? (check all that apply) No  Lake/natural watercourse on the tract  Lake/natural watercourse off the tract  Other property  Road/walkway  Description:       Degree of damage: Slight  Moderate  Severe  9. Contact made with (name)Wes Honeycutt Title       Inspection report given  or sent  to Person Financially Responsible. Date given/sent:       10. Corrective actions needed: Many of the areas from the May 6 inspection have been corrected. The only real issue is some ground stabilization on the roads where rills continue to form. 11. Comments: Overall the site has improved significantly. All major creek crosings and areas closes to the water have been improved and appear to be stable. Caroland Development and their partnters have done a great job on getting the site into compliance. This site could come to closure with a few more measures and stabilization in areas mentioned above . Wes and Shep have both been helpful in getting the site stable. Report by: Ed Barton Others present: Wes Honeycut, Shep Date of inspection: 24 June 2010 Time arriving at site: 0930 Time leaving site: 1230 cc:       ,       ,