Loading...
HomeMy WebLinkAboutCBPR-6-10-5900 Maple Springs Laundry Addition 2nd Submittal.tif 3 p � 1 I a WATTS TS ENGINEERS, PLLC 4876 US 64 x f Morganton, NC 28655 Phone(828)584 -3676 Fax(828)584 -3677 I June 24, 2010 Catawba County Plan Review Attn: Mr. Steve Deitz 76 North Center Street Hickory, NC 28601 Ref: Maple Springs Laundry Building Addition Reference Number CBPR -6-10 -5900 Dear Mr. Deitz: The following is in response to your review letter on the above referenced project. Item #11 proposed use shall be Factory (F1). Response - The Cover Sheet proposed occupancy shows F1 for this item. Item #12 Remove "preliminary" from drawing 3 of 3. Response Drawing 3 of 3 has been revised to correct this item. Item #13 Drawing 3 of 3 to be sealed, signed and dated. Response Drawing 3 of 3 has been revised to correct this item. Item #14 Provide large scale drawing of toilet room and show accessibility is met. Response Drawing GC3.1 has been added for this purpose. Item #15 Provide elevations of toilet fixtures and accessories to show accessibility is met. Response Drawing GC3.1 has been added for this purpose. Item #16 Exits are required to be accessible at grade level. Response - Sheet GC3 has one door swing reversed to allow accessible exit at front of building. Sheet E3 removed exit signs from inaccessible doors. Item #17 Indicate tempered glass. Response Sheet GC4 was revised for clarification of tempered glass. Item #18 Provide elevation of reception window with dimensions. Response Sheet GC4 was revised to show this detail. Item #19 Add note for weep holes and flashing note to sheet GC5. Response Sheet GC4 was revised to add this note. Item #20 Water supply and sewer drainage schedules do not show process equipment. Response Sheet P1 was revised to include this equipment. Item #21 Sheet P1 has fixture trap and drain info not in 2009 NC code. Response The table referenced was removed from P1 and Engineering Notes were added as a revision to correct this item. Item #22 Venting of drains incorrect. Wet venting has no table in code. Response Engineering Notes were added to to indicate design approach for these items. t S • Page 2 June 24, 201U Item #23 8" process waste line must be connected to sewer on P2. Response Drawing P2 was revised to add precast lint interceptor and then connection to city sewer. x Item #24 Provide location of 20 HP boiler and show connections. Response - Drawing P4 shows boiler location and process connections in room 121 which is part of the existing building. Item #25 Provide interceptor on P2. Response - Sheet P2 has been revised to show lint interceptor location. Item #26 Verify the washers discharge thru air gap. Response - Sheet P1 was revised to add Engineering Note for clarification of this item. Item #27 Verify the washer discharge water temperature is 140, degrees or less. Response - Sheet P1 was revised to add Engineering Note for clarification of this item. Item #28 Add a schedule of gas utilization for process equipment. Response - Sheet P4 was revised to add this schedule. Item #29 Transformer "T1" not shown on sheet E2. Response Sheet E2 was revised to add this transformer If you have any further questions or comments please feel free to contact me. Sincerely, WATTS Engineers, PLLC �'•`,```,l ` 1lrr� ' X11 r SEAL 04808 Max D. Watts, P.E. r t i i