Loading...
HomeMy WebLinkAboutPierre Foods Initial 26 apr 10.docSEDIMENTATION INSPECTION REPORT CATAWBA COUNTY UTILITIES & ENGINEERING DEPARTMENT PO Box 389, Newton, NC 28658 (828) 465-8161 FAX (828) 465-8392 Project Pierre Foods Expansion Project Number ECPC-4-10-6133 Person Financially Responsible Pierre Foods Inc Address PO Box 399 Claremont, NC 28610-0399 1. Project Location 3437 E Main St, Claremont NC Pictures: Prints  Slides  Digital  Video  2. Weather and Soil Conditions 70, cloudy skies, soil wet but workable 3. Is site currently under notice of violation?       Yes  No  If no, check violations below: 5. Violations (refer to Catawba County Local Ordinance Chapter 31):  a. No approved plan  g. Inadequate buffer zone  b. Failure to follow approved plan  h. Graded slopes and fills too steep  c. Failure to submit revised plan  i. Unprotected exposed slopes  d. Failure to provide adequate groundcover  j. Failure to maintain erosion control measures e. Insufficient measures to retain sediment on site  k. Other (describe):        f. Failure to take all reasonable measures 6. Phase of Grading a. rough grading complete  b. final grading complete Description:       7. Potential NPDES Permit violation? Yes  No  Describe       8. Has sedimentation damage occurred? Yes  If yes, where? (check all that apply) No  Lake/natural watercourse on the tract  Lake/natural watercourse off the tract  Other property  Road/walkway  Description:       Degree of damage: Slight  Moderate  Severe  9. Contact made with (name)Andrew Vachon Title Project Manager Inspection report given  or sent  to Person Financially Responsible. Date given/sent: 26 April 2010 10. Corrective actions needed: Silt fence along both sediment traps have the potential of being undermined. Will have to reseed areas along the berms on sediment traps 1 and 2. 11. Comments: Overall site looks good. Not all measures are installed due to the phasing of the project. As of this inspection, they are installing the box at the creek and will begin removing the pipe underneath the parking lot. Report by: Ed Barton Others present: Andrew Vachon Date of inspection: April 26 2010 Time arriving at site: 1130 Time leaving site: 1205 cc:       ,       ,