HomeMy WebLinkAbout4-23-10 314 Springhill Dr Sediment Report.pdf
SEDIMENTATION INSPECTION REPORT CATAWBA COUNTY UTILITIES & ENGINEERING DEPARTMENT PO Box 389, Newton, NC 28658 (828) 465-8161 FAX (828) 465-8392 Project Residental House Project Number
BLDR-12-09-3469 Person Financially Responsible David Boldon, Inc Address PO Box 868 Maiden, NC 28650-0868 1. Project Location 314 Springhill Ln Maiden Pictures: Prints Slides Digital
Video 2. Weather and Soil Conditions 3. Is site currently under notice of violation? Yes No If no, check violations below: 5. Violations (refer to Catawba County Local Ordinance Chapter
31): a. No approved plan 31-4 ( c ) g. Inadequate buffer zone 31-5 (a) (1) b. Failure to follow approved plan 31-5 (f) h. Graded slopes and fills too steep 31-5 (b) c. Failure to submit
revised plan 31-6 (m) i. Unprotected exposed slopes 31-5 (b) d. Failure to provide adequate groundcover 31-5 (d) j. Failure to maintain erosion control measures 31-13 e. Insufficient
measures to retain sediment on site 31-7 (e) k. Notice of activity initiation 31-6 (j) f. Failure to take all reasonable measures 31-4 (d) l. Other (describe): 6. Phase of Grading a.
rough grading complete b. final grading complete Description: 7. Potential NPDES Permit violation? Yes No Describe 8. Has sedimentation damage occurred? Yes If yes, where? (check all
that apply) No Lake/natural watercourse on the tract Lake/natural watercourse off the tract Other property Road/walkway Description: Sediment on adjoining property near driveway (see
photos) Degree of damage: Slight Moderate Severe 9. Contact made with (name) Title Inspection report in case file due to no activity given or sent to Person Financially Responsible.
Date given/sent: 4-27-10 10. Corrective actions needed: Submit an adequate sedimentation and erosion control plan for approval, covering all areas disturbed or to be disturbed. Submit
a revised sedimentation and erosion control plan for approval for the following areas: Install all sedimentation and erosion control measures as shown on the approved plan, including
but not limited to the following locations: Install temporary sediment traps, basins and rock dams and associated diversions as shown on the approved plan, including but not limited
to the following locations: Install erosion and sediment control devices sufficient to retain sediment on the tract: Install adequate drop inlet protection as shown on the approved plan,
including but not limited to the following locations: Provide adequate temporary or permanent ground cover on all graded slopes where rough or fine grading has been completed for 21
calendar days, including the following areas: Slopes and/or areas not under construction Provide adequate permanent ground cover on all areas where development has been completed for
15 working or 90 calendar days, whichever is shorter (15 working or 60 calendar days, whichever is shorter, in High Quality Waters): Slopes and/or areas not under construciton Maintain
all sedimentation and erosion control measures as specified in the approved plan and as required to prevent sedimentation damage damage including the following locations: 11. Comments:
Install Erosion Control measures along rear property and right side of property to prevent sediment from leaving this site -temporarly or permanently areas not under construction to
prevent sediment from leaving site. ** No measures installed since last inspection. No activity since last inspection: Report by: Ronda Gomez Others present: Date of inspection: 4-23-10
Time arriving at site: 9:30 Time leaving site: 9:35
cc: , ,