AQWA Inc.
2604 Willis Court,Wilson, NC 27896
Phone: 252-243-7693-Email: aqwatammysanders@gmail.com
Customer Name: Krajack Date of Inspection: 8/30/2022
Address: Krajack-8852 Dogleg Road Sherrill Ford,NC 28673 Arrival Time: 12:41:00 PM
System AX ID: AX-147941 Departure Time: 1:45:00 PM
County: Catawba
Permit No.
Inspection and Maintenance Checklist-AX-RT with LPP or P-Manifold or D-BOX
Septic Tank Inspection
Tank At Site Tank 1
Tank 1 Inlet Readings Tank 2 Inlet Readings
3 Scum 10 Sludge Scum Sludge
Tank 1 Outlet Readings Tank 1 Outlet Readings
0 5;:..r. 6 Sludge Scum Sludge
Tank Inspection Questions Tank 1 Tank 2
Clean Effluent Filter. Cleaned
Check for Influent or Effluent Blockages: No Blockage
Inspect TanIRiser for Leaks: None Seen
Control Panel Inspection
Check Pump Operates In Manual Mode: Yes
Recirculation Pumps Recirculation Pump 1
Pump 1 Timer Settings Pump 1-Counters and Elapsed Time Meters
0.8 Dose 10 Rest 49093 CT 2009.7 ETM
Dose Pumps
Pump 1 Tmer Settings Pump 1-Counters and Elapsed lime Meters
Demand Dose Demand Rest 1782 CT 93.8 ETM
Verify Conduit Seal: Verified
AX-RT Treatment Pod Inspection
Pod inspection .Pod 1
Inspect for Pending or Bridging: None
Check and Record PSI: 4.5
Verify Orifice Position and Assess for Clogging: Cleaned
Check for Odors: None
Clean,Brush,Flush Lateral: Done
Recheck and Record PSI 4.5
Flush Pod Throroughly: Done
Inspect and Clean Vents: Cleaned
Inspection and Maintenance Checklist-AX-RT with LPP or P-Manifold or DBOX
Recirculation Chamber Inspection
Verify Inlet Flow: No Inflow
Inspect Liquid: Normal Level
Record Scum/Sludge Levels:
Inlet Readings: Outlet Readings:
0 Scum t Sludge 0 Scum 0 Sludge
Inspect Tank/Riser for Leakage: None Seen Verify All Floats Work: Operating Properly
Pump Sludge to Septic Tank: Not Needed Verify Audible Alarm Works for High Water float: Works Property
Pull Pump and Clean Screen: Cleaned Verify Neat Wrap of Float and Pump Cords: Checked
Verify No Leaking In Piping or Flex Hoses: None Seen Verify Conduit Seal: Verified
Ultraviolet Disinfection Unit Inspection
Does System Have a UV? Yes
How Many UV Disinfectant Units Present? UV 1
rrEN 9Y, r :7 S:.
After Disconnecting Power,Clean or Replace Bulb As Needed: Replaced
Flush Housing Thoroughly: Flushed
Return Power and Verify Proper Function: Verified
Dosing Chamber Inspection
Inspect for Tank/Riser Leakage: None Seen
Inspect Liquid: Normal Level
Record Scum/Sludge Levels:
Inlet Readings: Outlet Readings:
Scum Sludge 0 Scum 0 Sludge
Visually Check Liquid Level: Normal Verify Audible Alarm Works for High Water float: Works Properly
Verify No Leaks In Piping or Flex Hoses: None Seen Verify Neat Wrap of Float and Pump Cords: Checked
Inspect Pump Intake: Cleaned Delivery Rate at Start Up: Unknown
Verify All Floats Work: Operating Properly Verify Conduit Seal: Verified
LPP or P-Manifold or DBOX Inspection
Areas Mowed and Clear of Obstruction: Yes Flush Laterals: Flushed
Area Free of Ponding or Surface Effluent: Yes Set and Record Head Pressure: 3 ft
Curtain Drains,Ditches,Swales Functioning Properly: Yes Check Hardware: Functioning Properly
Current Delivery Rate: 26.4 Pump Efficiency:
Return Valves and Control Panel to proper settings Done
Control Panel Communication Checked: Panel called in.
Inspection Notes
34-06=12x4.4=52.8+2=26.4
Paul Smith
Operator Operators Signature
F
AQWA
The clear leader.
AQWA Inc. 1 )13S'�
2604 Willis Court,Wilson, NC 27896
Phone: 252-243-7693— Email: aqwatammysanders@gmail.com
Customer Name: Krajack Date of Inspection: 2/22/2023
Address: Krajack-8852 Dogleg Road Sherrill Ford,NC 28673 Arrival Time: 9:50:00 AM
System AX ID: AX-147941 Departure Time: 12:30:00 PM
County: Catawba
Permit No.
Inspection and Maintenance Checklist-AX-RT with LPP or P-Manifold or D-BOX
Septic Tank Inspection
Tank At Site Tank 1
Tank 1 Inlet Readings Tank 2 Inlet Readings
2 Scum 6 Sludge Scum Sludge
Tank 1 Outlet Readings Tank 1 Outlet Readings
0 Scum 14 Sludge Scum Sludge
Tank Inspection Questions ";
Clean Effluent Filter: Cleaned
Check for Influent or Effluent Blockages: No Blockage
Inspect Tank/Riser for Leaks: None Seen
Control Panel Inspection
Check Pump Operates In Manual Mode: Yes
Recirculation Pumps Recirculation Pump 1
Pump 1 Timer Settings Pump 1-Counters and Elapsed lime Meters
0.8 Dose 10 Rest 70392 CT 2297.5 ETM
Dose Pumps
Pump 1 Timer Settings Pump 1-Counters and Elapsed lime Meters
Demand Dose Demand Rest 1959 CT 102.6 ETM
Verify Conduit Seal: Verified
AX-RT Treatment Pod Inspection
Inspect for Ponding or Bridging: None
Check and Record PSI: 4.5
Verify Orifice Position and Assess for Clogging: Cleaned
Check for Odors: None
Clean.Brush,Flush Lateral: Done
Recheck and Record PSI 4.5
Flush Pod Throroughly: Done
Inspect and Clean Vents: Cleaned
Inspection and Maintenance Checklist-AX-RT with LPP or P-Manifold or DBOX
Recirculation Chamber Inspection
Verify Inlet Flow: No Inflow
I
Inspect Liquid: Normal Level
Record Scum/Sludge Levels:
Inlet Readings: Outlet Readings:
0 Scum 0 Sludge 0 Scum 12 Sludge
Inspect Tank/Riser for Leakage: None Seen Verify All Floats Work: Operating Properly
Pump Sludge to Septic Tank: Pumped Verify Audible Alarm Works for High Water float: Works Properly
Pull Pump and Clean Screen: Cleaned Verify Neat Wrap of Float and Pump Cords: Checked
Verify No Leaking In Piping or Flex Hoses: None Seen Verify Conduit Seal: Verified
Ultraviolet Disinfection Unit Inspection
Does System Have a UV? Yes
How Many UV Disinfectant Units Present? UV 1
I UV Disinfectant Unit Inspection UV 1 UV2
Atter Disconnecting Power,Clean or Replace Bulb As Needed: Cleaned
Flush Housing Thoroughly: Flushed
Return Power and Verify Proper Function: Verified
Dosing Chamber Inspection
Inspect for Tank/Riser Leakage: None Seen
Inspect Liquid: Normal Level
Record Scum/Sludge Levels:
Inlet Readings: Outlet Readings:
Scum Sludge 0 Scum 0 Sludge
Visually Check Liquid Level: Normal Verify Audible Alarm Works for High Water float: Works Properly
Verify No Leaks In Piping or Flex Hoses: None Seen Verify Neat Wrap of Float and Pump Cords: Checked
Inspect Pump Intake: Cleaned Delivery Rate at Start Up: Unknown
Verify All Floats Work: Operating Properly Verify Conduit Seal: Verified
LPP or P-Manifold or DBOX Inspection
Areas Mowed and Clear of Obstruction: Yes Flush Laterals: See Notes
Area Free of Ponding or Surface Effluent: Yes Set and Record Head Pressure: N/A
Curtain Drains,Ditches,Swales Functioning Properly: Yes Check Hardware: Repair Needed
Current Delivery Rate: Pump Efficiency:
Return Valves and Control Panel to proper settings Done
Control Panel Communication Checked: Panel called In.
Inspection Notes
Distribution valve box has leak between pvc Ts.Was unable to get accurate
dose pump flow data for distribution field.Will have to rebuild a manifold
at the shop and return with it.The installer for this system built this
manifold with all pvc Ts butted up to each other,so there is no way to
repair the leak without rebuilding the entire manifold.Will have to return
with replacement equipment.
Paul Smith
Operator Operators Signature
AOWA J)nh cs5
The cleat leader. l
AQWA Inc.
2604 Willis Court,Wilson, NC 27896
Phone: 252-243-7693—Email: aqwatammysanders@gmail.com
Customer Name: Krajack Date of Inspection: 8/16/2023
Address: Krajack-8852 Dogleg Road Sherrill Ford,NC 28673 Arrival Time: 7:45:00 AM
System AX ID: AX-147941 Departure Time 9:45:00 AM
County: Catawba
Permit No.
Inspection and Maintenance Checklist-AX-RT with I PP or P-Manifold or D-BOX
Septic Tank Inspection
Tank At Site Tank 1
Tank 1 Inlet Readings Tank 2 Inlet Readings
2 Scum 6 Sludge Scum Sludge
Tank 1 Outlet Readings lank 1 Outlet Readings
0 Scum 6 Sludge Scum Sludge
'',, y,
Clean Effluent Filter: Cleaned
Check for Influent or Effluent Blockages: No Blockage
Inspect Tank/Riser for Leaks: None Seen
Control Panel Inspection
Check Pump Operates In Manual Mode: Yes
Recirculation Pumps Recirculation Pump 1
Pump 1 Tmer Settings Pump 1-Counters and Elapsed Time Meters
0.8 Dose 10 Rest 92235 CT 2591.8 ETM
Dose Pumps
Pump 1 Timer Settings Pump 1-Counters and Elapsed Time Meters
Demand Dose Demand Rest 110.1 CT 2159 ETM
Verify Conduit Seal: Verified
AX-RT Treatment Pod inspection
Inspect for Ponding or Bridging: None
Check and Record PSI: 5
Verify Orifice Position and Assess for Clogging: Cleaned
Check for Odors: None
Clean,Brush,Flush Lateral: Done
Recheck and Record PSI 5
Flush Pod Throroughly: Done
Inspect and Clean Vents: Cleaned
Inspection and Maintenance Checklist-AX-RT with LPP or P-Manifold or DBOX
•
Recirculation Chamber Inspection .
Verify Inlet Flow: No Inflow
Inspect Liquid: Normal Level
Record Scum/Sludge Levels:
Inlet Readings: Outlet Readings:
0 Scum 0 Sludge 0 Scum 1 Sludge
Inspect Tank/Riser for Leakage: None Seen Verify All Floats Work: Operating Properly
Pump Sludge to Septic Tank: Not Needed Verify Audible Alarm Works for High Water float: Works Property
Pull Pump and Clean Screen: Cleaned Verify Neat Wrap of Float and Pump Cords: Checked
Verify No Leaking In Piping or Flex Hoses: None Seen Verify Conduit Seal: Verified
Ultraviolet Disinfection Unit Inspection
Does System Have a UV? Yes
How Many UV Disinfectant Units Present? UV 1
After Disconnecting Power,Clean or Replace Bulb As Needed: Replaced
Flush Housing Thoroughly: Flushed
Retum Power and Verify Proper Function: Verified
Dosing Chamber Inspection
Inspect for Tank/Riser Leakage: None Seen
Inspect Liquid: Normal Level
Record Scum/Sludge Levels:
Inlet Readings: Outlet Readings:
Scum Sludge 0 Scum 0 Sludge
Visually Check Liquid Level: Normal Verify Audible Alarm Works for High Water float: Works Properly
Verify No Leaks In Piping or Flex Hoses: None Seen Verify Neat Wrap of Float and Pump Cords: Checked
Inspect Pump Intake: Cleaned Delivery Rate at Start Up: Unknown
Verify All Floats Work: Operating Properly Verify Conduit Seal: Verified
LPP or P-Manifold or DBOX Inspection
Areas Mowed and Clear of Obstruction: Yes Flush Laterals: Flushed
Area Free of Ponding or Surface Effluent: Yes Set and Record Head Pressure: 3 ft
Curtain Drains,Ditches,Swales Functioning Properly: Yes Check Hardware: Functioning Properly
Current Delivery Rate: 35.2 Pump Efficiency:
Return Valves and Control Panel to proper settings Done
Control Panel Communication Checked: Panel called In.
Inspection Notes
37-45=8 x4.4=35.2
Paul Smith
Operator Operators Signature
aull\
eAQWA
The clear leader.
AQWA Inc.
2604 Willis Court,Wilson, NC 27896
Phone:252-243-7693—Email:aqwatammysanders@gmail.com
Customer Name: Krajack Date of Inspection: 3/25/2025
Address: Krajack-8852 Dogleg Road Sherrill Ford,NC 28673 Arrival Time: 9:45:00 AM
System AX ID: AX-147941 Departure Time: 1:00:00 PM
County: Catawba
Permit No.
Inspection and Maintenance.Checklist-AX-RT with LPP or P-Manifold or D-BOX
Septic Tank Inspection
Tank At Site Tank 1
Tank 1 Inlet Readings Tank 2 Inlet Readings
3 Scum 14 Sludge Scum Sludge
Tank 1 Outlet Readings Tank 1 Outlet Readings
0 Scum 8 Sludge Scum Sludge
Tank Inspection Questions Tank 1 Tank 2
Clean Effluent Filter: Cleaned
Check for Influent or Effluent Blockages: No Blockage
Inspect Tank/Riser for Leaks: None Seen
Control Panel Inspection
Check Pump Operates In Manual Mode: Yes
Recirculation Pumps Recirculation Pump'1
Pump 1 Timer Settings Pump 1-Counters and Elapsed Time Meters
0.8 Dose 10 Rest 67744 CT 3610.4 ETM
Dose Pumps
Pump 1 Timer Settings Pump 1-Counters and Elapsed Time Meters
Demand Dose Demand Rest 3211 CT 151.1 ETM
Verify Conduit Seal: Verified
AX-RT Treatment Pod Inspection
Pod Inspection Pod 1
Inspect for Ponding or Bridging: None
Check and Record PSI: 5
Verify Orifice Position and Assess for Clogging: Ok
Check for Odors: None
Clean,Brush,Flush Lateral: Done
Recheck and Record PSI 5
Flush Pod Throroughly: Done
Inspect and Clean Vents: Vents Clear
Inspection and Maintenance Checklist-AX-RT with LPP or P-Manifold or DBOX
Recirculation Chamber Inspection _ _
Verify Inlet Flow: No Inflow
Inspect Liquid: High Level
Record Scum/Sludge Levels:
Inlet Readings: Outlet Readings:
0 Scum 2 Sludge 0 Scum 2 Sludge
Inspect Tank/Riser for Leakage: None Seen Verify All Floats Work: Operating Properly
Pump Sludge to Septic Tank: Not Needed Verify Audible Alarm Works for High Water float: Works Properly
Pull Pump and Clean Screen: Cleaned Verify Neat Wrap of Float and Pump Cords: Checked
Verify No Leaking In Piping or Flex Hoses: None Seen Verify Conduit Seal: Verified
Ultraviolet Disinfection Unit Inspection
Does System Have a UV? Yes
How Many UV Disinfectant Units Present? UV 1
UV Disinfectant Unit Inspection UV 1 UV2
After Disconnecting Power,Clean or Replace Bulb As Needed: Cleaned
Flush Housing Thoroughly: Flushed
Retum Power and Verify Proper Function: Verified
Dosing Chamber Inspection
Inspect for Tank/Riser Leakage: None Seen Turbidity Reading: 10.35
Inspect Liquid: Normal Level
Record Scum/Sludge Levels:
Inlet Readings: Outlet Readings:
Scum Sludge 0 Scum 1 Sludge
Visually Check Liquid Level: Normal Verify Audible Alarm Works for High Water float: Works Properly
Verify No Leaks In Piping or Flex Hoses: None Seen Verify Neat Wrap of Float and Pump Cords: Checked
Inspect Pump Intake: Ok Delivery Rate at Start Up: Unknown
Verify All Floats Work: Operating Properly Verify Conduit Seal: Verified
LPP or P-Manifold or DBOX Inspection
Areas Mowed and Clear of Obstruction: Yes Flush Laterals:,Flushed
Area Free of Ponding orSurface Effluent: Yes Set and Record Head Pressure: 3 ft
Curtain Drains,Ditches,Swales Functioning Properly: Yes Check Hardware: Functioning Properly
Current Delivery Rate: 35.2 Pump Efficiency:
Retum Valves and Control Panel to proper settings Done
Control Panel Communication Checked: Panel called in
Inspection Notes
Textile missing upon arrival,retrieved from bottom of POD and placed back
into position.Spin aerator assembly detached from 1 bracket support,
reattached assembly.Replaced 6 inch lid clean out at distribution box.
Recommended to owner not to let mower wheels ride directly on cap,the
ground is soft.33.5141.5=8x4.4=35.2
Paul Smith
Operator Operators Signature
OA 001c3- - 0-3R R3--
AQWK
The clear leader.
AQWA Inc.
2604 Willis Court,Wilson, NC 27896
Phone:252-243-7693—Email:aqwatammysanders@gmail.com
Customer Name: Krajack Date of Inspection: 10/23/2025
Address: Krajack-8852 Dogleg Road Sherrill Ford,NC 28673 Arrival Time: 11:45:00 AM
System AX ID: AX-147941 Departure Time: 1:15:00 PM
County: Catawba
Permit No.
Inspection and Maintenance Checklist-<AX-RTwith LPP or P-Manifold or D-BOX
Septic Tank Inspection
Tank At Site Tank 1
Tank 1 Inlet Readings Tank 2 Inlet Readings
5 Scum 5 Sludge Scum Sludge
Tank 1 Outlet Readings Tank 1 Outlet Readings
0 Scum 9 Sludge Scum Sludge
Tank Inspection Questions Tank 1 Tank
Clean Effluent Filter: Cleaned
Check for Influent or Effluent Blockages: No Blockage
Inspect Tank/Riser for Leaks: None Seen
Control Panel Inspection
Check Pump Operates In Manual Mode: Yes
Recirculation Pumps Recirculation Pump 1
Pump 1 Timer Settings Pump 1-Counters and Elapsed Time Meters
0.8 Dose 10 Rest 91891 CT 3936.1 ETM
Dose Pumps
Pump 1 Timer Settings Pump 1-Counters and Elapsed Time Meters
Demand Dose Demand Rest 164.5 CT 3570 ETM
Verify Conduit Seal: Verified
AX-RT Treatment.Pod Inspection
podinspection, Pod') 4_.
Inspect for Ponding or Bridging: None
Check and Record PSI:
Verify Orifice Position and Assess for Clogging: Ok
Check for Odors: None
Clean,Brush,Flush Lateral: Done
Recheck and Record PSI
Flush Pod Throroughly: Done
Inspect and Clean Vents: Vents Clear
Inspection and Maintenance Checklist-AX-RT with LPP or P-Manifold or DBOX
III I
Recirculation Chamber Inspection
Verify Inlet Flow: No Inflow
Inspect Liquid: Normal Level
Record Scum/Sludge Levels:
Inlet Readings: Outlet Readings:
0 Scum 3 Sludge 0 Scum 1 Sludge
Inspect Tank/Riser for Leakage: None Seen Verify All Floats Work: Operating Properly
Pump Sludge to Septic Tank: Not Needed Verify Audible Alarm Works for High Water float: Works Properly
Pull Pump and Clean Screen: Cleaned Verify Neat Wrap of Float and Pump Cords: Checked
Verify No Leaking In Piping or Flex Hoses: None Seen Verify Conduit Seal: Verified
Ultraviolet Disinfection Unit,lnspection
Does System Have a UV? Yes
How Many UV Disinfectant Units Present? UV 1
UV Disinfectant Unitlnspectiotf UV 1. -UV2'
After Disconnecting Power,Clean or Replace Bulb As Needed: Replaced
Flush Housing Thoroughly: Flushed
Return Power and Verify Proper Function: Verified
Dosing Chamber Inspection
Inspect for Tank/Riser Leakage:- None Seen Turbidity Reading: 0.85
Inspect Liquid: Normal Level
Record Scum/Sludge Levels:
Inlet Readings: Outlet Readings:
Scum Sludge 0 Scum 4 Sludge
Visually Check Liquid Level: Normal Verify Audible Alarm Works for High Water float: Works Properly
Verify No Leaks In Piping or Flex Hoses: None Seen Verify Neat Wrap of Float and Pump Cords: Checked
Inspect Pump Intake: Ok Delivery Rate at Start Up: Unknown
Verify All Floats Work: Operating Properly Verify Conduit Seal: Verified
,LPP or P-Manifold or DBOX Inspection
Areas Mowed and Clear of Obstruction: Yes Flush Laterals:
Area Free of Ponding or Surface Effluent: Yes Set and Record Head Pressure:
Curtain Drains,Ditches,Swales Functioning Properly: Yes Check Hardware: Functioning Properly
Current Delivery Rate: 35.2 Pump Efficiency:
Return Valves and Control Panel to proper settings Done
Control Panel Communication Checked: Called in healthy.
Inspection Notes -
40-52=8x4.4=35.2 SEPTIC TANK needs to be pumped out.
Christopher Sanders C _A
Operator Operators Signature