HomeMy WebLinkAboutBLD2007-02645 Lab no -128867-872 Cyl strength rpt.tif
Page: 1 of 1
. o R EILA
P R O P E R T Y S C I E N C E S
281 Fairforest Way / Greenvilie, SC 29607 1864-297-9944 1864-297-0462
CYLINDER STRENGTH REPORT
Job No: CH6051 Molded: 06123108 Prepared: 07/01/08
Lab No: 128867 Received: 06/24/08 Date: 07/08108
Project: TARGET DISTRIBUTION CENTER
Client: ARCHER WESTERN CONTRACTORS
Contractor: FLORCON
Technician: BILLY YOUNG
Concrete Supplier: KERR
Design Mix No: T52467 Strength Requirement: 3500 PSI Tested @ (Days): 28
Location of Pour: Pour No. 15 - 6.25 to 8.75 and a to A.75
Truck No.: 15 No. of Specimens: 5 Slump: 5-1/2 inches
Ticket No: 2925 Set No: 1 of 7 Air Content: 1.4 %
Time Batched: 12;43 Quantity: 10/51 Unit Wt: 148.0 pcf
Water Added on Job: 0 gals Time Molded: 1:15 Concrete Temp: 70 F
Water Requested By: - Atmosphere Temp: 58 F
Diameter Area Maximum Strength Type of
Specimen Age Date Remarks
Number (days) Tested (ins) (sq ins) Load oad (psi) Fracture
1 7 06130/08 6.00 28.27 108704 3840 4
2 14 07/07/08 6.00 28.27 118930 4210 4
Comments: Tests conducted in general accordance with ASTM C 31, C 172, C 231, C 143, C 1064, C 39, and C 138 except initial
curing conditions not documented.
If you have any questions please call WEINHOLD, JOEL at 864-297-9944.
REPORT DISTRIBUTION:
ARCHER WESTERN CONTRACTORS 1 MR. MICHAEL CARLIN (A-1) TYPES OF FRACTURES
4 l i , f 1
CARLISLE ASSOCIATES \ MR. EUGENE J. RESCH. P.E. (A-1)
CLARY HOOD, INC 1 MR. ANDY PAINTER (A-1)
X i,~ h
~ <<
r ~ b 1 v' ~
r r,
1 2 3 4 5 6
i
I
Page: 1 of 1
o R E
PROPERTY SCIENCES
281 Fairforest Way I Greenville, SC 29607 / 864-297-99441864-297-0462
CYLINDER STRENGTH REPORT
Job No: CH6051 Molded: 06/23108 Prepared: 07109/08
Lab No: 128868 Received: 06/24108 Date: 07108108
Project: TARGET DISTRIBUTION CENTER
Client: ARCHER WESTERN CONTRACTORS
Contractor: FLORCON
Technician: BILLY YOUNG
Concrete Supplier: KERR
Design Mix No: T52467 Strength Requirement: 3500 PSI Tested @ (Days): 28
Location of Pour: Pour No. 15 - 6.25 to 8.75 and A.75 to B.5
Truck No.: 19 No. of Specimens: 5 Slump: 5.0 inches
Ticket No: 2939 Set No: 2 of 7 Air Content: 1.4 %
Time Batched: 1:45 Quantity: 15015 Unit Wt: 148.0 pcf
Water Added on Job: 0 gals Time Molded: - Concrete Temp: 70 F
Water Requested By: - Atmosphere Temp: 58 F
Diameter Area Maximum Strength T Type of
Specimen Age Date yp Remarks
Number (days) Tested (ins) (sq ins) Load (psi) Fracture
(Ibs)
1 7 06/30/08 6.00 28.27 99092 3500 4
2 14 07/07/08 6.00 28.27 114309 4040 4
Comments: Tests conducted in general accordance with ASTM C 31, C 172, C 231, C 143, C 1064, C 39, and C 138 except initial
curing conditions not documented.
If you have any questions please call WEINHOLD, JOEL at 864-297-9944.
REPORT DISTRIBUTION.
ARCHER WESTERN CONTRACTORS 1 MR. MICHAEL CARLIN (A-1) TYPES OF FRACTURES
CARLISLE ASSOCIATES 1 MR. EUGENE J. RESCH, P.E. (A-1)
CLARY HOOD, INC MR. ANDY PAINTER (A-1)
ISI 1R~
1 r
V1
t t l i l
1 2 3 4 5 6
Page: 1 of 1
o R E"
P R O P E R T Y S C I E N C E S
281 Fairforest Way / Greenville, SC 29607 / 864-297-9944 / 864-297-0462 -
CYLINDER STRENGTH REPORT
Job No: CH6051 Molded: 06/23108 Prepared:.07/01/08
Lab No: 128869 Received: 06124/08 Date: 07/08/08
Project: TARGET DISTRIBUTION CENTER
Client: ARCHER WESTERN CONTRACTORS
Contractor: FLORCON
Technician: BILLY YOUNG
Concrete Supplier: KERR
Design Mix No: T52467 Strength Requirement: 3500 PSI Tested @ (Days): 28
Location of Pour: Pour No. 15 - 6.25 to 8.75 and B.5 to C.25
Truck No.: 63 No. of Specimens: 5 Slump: 6-1/4 inches
Ticket No: 2954 Set No: 3 of 7 Air Content: 0.4 %
Time Batched: 2:41 Quantity: 30015/ Unit Wt: 149.5 pef
Water Added on Job: 0 gals Time Molded: 2:55 Concrete Temp: 70 F
Water Requested By: - Atmosphere Temp: 58 F
Specimen Age Date Diameter Area Maximum Strength Type of
Number (days) Tested (ins) (sq ins) Load (psi) Fracture Remarks
(Ibs)
1 7 06/30/08 6.00 28.27 100415 3550 4
2 14 07/07/08 6.00 28.27 115059 4070 4
Comments: Tests conducted in general accordance with ASTM C 31, C 172, C 231, C 143, C 1064, C 39, and C 138 except initial
curing conditions not documented.
If you have any questions please call WEINHOLD, JOEL at 864-297-9944.
REPORT DISTRIBUTION.
ARCHER WESTERN CONTRACTORS 1 MR. MICHAEL CARLIN (A-1) TYPES OF FRACTURES
CARLISLE ASSOCIATES 1 MR. EUGENE J. RESCH, P.E. (A-1)
GLARY HOOD, INC 1 MR. ANDY PAINTER (A-1) I i I ~ Iti~ tia~ ,
i b~ 1 VI f
i ~ 1,1
1 2 3 4 5 6
Page: 1 of 1
o R EM
PROPERTY SCIENCES
2151 Fairforest Way / Greenville, SC 29607 / 854-297-99441864-297-0462
CYLINDER STRENGTH REPORT
Job No: CH6051 Molded: 06123108 Prepared: 07101108
Lab No: 128870 Received: 06124108 Date: 07/08/08
Project: TARGET DISTRIBUTION CENTER
Client: ARCHER WESTERN CONTRACTORS
Contractor: FLORCON
Technician: BILLY YOUNG
Concrete Supplier: KERR
Design Mix No: T52467 Strength Requirement: 3500 PSI Tested @ (Days): 28
Location of Pour: Pour No. 15 - 6.25 to 8.75 and C.25 to D
Truck No.: 14 No. of Specimens: 5 Slump: 6 inches
Ticket No: 2969 Set No: 4 of 7 Air Content: 1.4 %
Time Batched: 3:40 Quantity: 450151 Unit Wt: 148.4 pcf
Water Added on Job: 0 gals Time Molded: 3:55 Concrete Temp: 70 F
Water Requested By: - Atmosphere Temp: 60 F
Specimen Age Date Diameter Area Maximum Strength Type of Remarks
Number (days) Tested (ins) (sq ins) Load (psi) Fracture
(Ibs)
1 7 06/30/08 6.00 28.27 99515 3520 4
2 14 07/07/08 6.00 28.27 118495 4190 4
Comments: Tests conducted in general accordance with ASTM C 31, C 172, C 231, C 143, C 1064, C 39, and C 138 except initial
curing conditions not documented.
If you have any questions please call WEINHOLD, JOEL at 864-297-9944.
REPORT DISTRIBUTION.
ARCHER WESTERN CONTRACTORS 1 MR. MICHAEL CARLIN (A-1) TYPES OF FRACTURES
CARLISLE ASSOCIATES 1 MR. EUGENE J. RESCH, P.E. (A-1)
CLARY HOOD, INC 1 MR. ANDY PAINTER (A-1)
1 t i r.
X I ti I ~y it )L '
LLij
1 2 3 4 5 6
Page: 1 of 1
Q0 RET"
PROPERTY SCIENCES
281 Fairforest Way / Greenville, SC 296071864-297-9944 / 864-297-0462
CYLINDER STRENGTH REPORT
Job No: CH6051 Molded: 06123108 Prepared: 07101/08
Lab No: 128871 Received: 06124108 Date: 07/08108
Project: TARGET DISTRIBUTION CENTER
Client: ARCHER WESTERN CONTRACTORS
Contractor. FLORCON
Technician: BILLY YOUNG
Concrete Supplier: KERR
Design Mix No: T52467 Strength Requirement: 3500 PSI Tested @ (Days): 28
Location of Pour: Pour No. 15 - 6.25 to 8.75 and D to E
Truck No.: 63 No. of Specimens: 5 Slump: 5-314 inches
Ticket No: 2984 Set No: 5 of 7 Air Content: 0.6 %
Time Batched: 4:34 Quantity: 600151 Unit Wt: 149.3 pcf
Water Added on Job: 0 gals Time Molded: 4:50 Concrete Temp: 70 F
Water Requested By: - Atmosphere Temp: 60 F
Specimen Age Date Diameter Area Maximum Strength Type of
Number (days) Tested (ins) (sq ins) (Iota; (psi) Fracture Remarks
1 7 06/30/08 6.00 28.27 96577 3420 4
2 14 07107/08 6.00 28.27 115123 4070 4
Comments: Tests conducted in general accordance with ASTM C 31, C 172, C 231, C 143, C 1064, C 39, and C 138 except initial
curing conditions not documented.
If you have any questions please call WEINHOLD, JOEL at 864-297-9944.
REPORT DISTRIBUTION:
ARCHER WESTERN CONTRACTORS 1 MR. MICHAEL CARLIN (A-1) TYPES OF FRACTURES
CARLISLE ASSOCIATES 1 MR. EUGENE J. RESCH, P.E. (A-1)
CLARY HOOD, INC \ MR. ANDY PAINTER (A-1)
I ti l t k It '
~I~a
1 2 3 4 5 6
Page: 1 of 1
0RE
P R O P E R T Y S C I EN C E S
281 Fairforest Way / Greenville, SC 29607 / 864-297-99441864-297-0462
CYLINDER STRENGTH REPORT
Job No: CH6051 Molded: 06/23108 Prepared: 07101/08
Lab No: 128872 Received: 06124108 Date: 07108/08
Project: TARGET DISTRIBUTION CENTER
Client: ARCHER WESTERN CONTRACTORS
Contractor: FLORCON
Technician: BILLY YOUNG
Concrete Supplier: KERR
Design Mix No: T52467 Strength Requirement: 3500 PSI Tested @ (Days): 28
Location of Pour: Pour No. 15 - 6.25 to 8.75 and E to F
Truck No.: 14 No. of Specimens: 5 Slump: 5-314 inches
Ticket No: 2999 Set No: 6 of 7 Air Content: 1.2 %
Time Batched: 5:40 Quantity: 75015 Unit Wt: 148.9 pcf
Water Added on Job: 0 gals Time Molded: 5:55 Concrete Temp: 70 F
Water Requested By: - Atmosphere Temp: 60 F
Specimen Age Date Diameter Area Maximum Strength Type of
Number (days) Tested (ins) (sq ins) `o y (psi) Fracture Remarks
1 7 06/30/08 6.00 28.27 105930 3750 4
2 14 07/07/08 6.00 28.27 119615 4230 4
Comments: Tests conducted in general accordance with ASTM C 31, C 172, C 231, C 143, C 1064, C 39, and C 136 except initial
curing conditions not documented.
If you have any questions please call WEINHOLD, JOEL at 864-297-9944.
REPORT DISTRIBUTION.
ARCHER WESTERN CONTRACTORS 1 MR. MICHAEL CARLIN (A-1) TYPES OF FRACTURES
CARLISLE ASSOCIATES \ MR. EUGENE J. RESCH, P.E. (A-1) r r I r
CLARY HOOD, INC \ MR. ANDY PAINTER (A-1)
~ l S i r
X I\ I ~ k '
r Lea vit
1 4 ! I ~
1 2 3 4 5 6