ORE
P R O P E R T Y S C I E N C E S
281 Fairforest Way / Greenville, SC 29607 / 864-297-9944 / 864-297-0462
CYLINDER STRENGTH REPORT
Job No: CH6051 Molded: 05/15108 Prepared: 05123/08
Lab No: 127373 Received: 05116108 Date: 06/03108
Project: TARGET DISTRIBUTION CENTER
Client: ARCHER WESTERN CONTRACTORS
Contractor: FLORCON
Technician: BILLY YOUNG
Concrete Supplier: KERR
Design Mix No: T52467 Strength Requirement: 3500 PSI Tested @ (Days): 28
Location of Pour: Pour No. 6 from QQ to LL and 6.9 to 5.7
Truck No.: 15 No. of Specimens: 5 Slump: 5-112 inches
Ticket No: 1369 Set No: 1 of 6 Air Content: 1.0 %
Time Batched: 3:46 Quantity: 10/51640 Unit Wt: 150.2 pcf
Water Added on Job: 0 gals Time Molded: 4:15 Concrete Temp: 70 F
Water Requested By: - Atmosphere Temp: 60 F
Specimen Age Date Diameter Area Maximum Strength Type of
Number (days) Tested (ins) (sq ins) `o ; (psi) Fracture Remarks
1 7 05/22/08 6.00 28.27 95152 3370 4
2 14 05129/08 6.00 28.27 105438 3730 4
Comments: Tests conducted in general accordance with ASTM C 31, C 172, C 231, C 143, C 1064, C 39, and C 138 except initial
curing conditions not documented.
i
If you have any questions please call WEINHOLD, JOEL at 864-297-9944.
1
REPORT DISTRIBUTION:
ARCHER WESTERN CONTRACTORS \ MR. MICHAEL CARLIN (A-1) TYPES OF FRACTURES
CARLISLE ASSOCIATES 1 MR. EUGENE J. RESCH, P.E. (A-1)
CLARY HOOD, INC \ MR. ANDY PAINTER (A-1) 1, f~ j + , t i
~t 1 1 ~ ~t 4~ j
rr ~J~ V1
I r
1 2 3 4 5 6
i
6
i
a
Page: 1 of 1
0 R E"*'
P R O P E R T Y S C I E N C E S
281 Fairforest Way / Greenville, SC 296071864-297-9944 / 864-297-0462
CYLINDER STRENGTH REPORT
Job No: CH6051 Molded: 05115108 Prepared: 05123/08
Lab No: 127372 Received: 05116/08 Date: 06103/08
Project: TARGET DISTRIBUTION CENTER
Client: ARCHER WESTERN CONTRACTORS
Contractor: FLORCON
Technician: BILLY YOUNG
Concrete Supplier: KERR
Design Mix No: T52467 Strength Requirement: 3500 PSI Tested @ (Days): 28
Location of Pour: Pour No. 6 from QQ to LL and 5.7 to 4.6
Truck No.: 402 No. of Specimens: 5 Slump: 4-1/2 inches
Ticket No: 1383 Set No: 2 of 6 Air Content: 0.8 %
Time Batched: 5:07 Quantity: 150/51640 Unit Wt: 150.3 pcf
Water Added on Job: 0 gals Time Molded: 6:00 Concrete Temp: 70 F
Water Requested By: - Atmosphere Temp: 60 F
Specimen Age Date Diameter Area Maximum Strength Type of Number (days Tested (ins) (sq ins) Load (psi) Fracture Remarks
1 7 05/22/08 6.00 28.27 101922 3600 4
2 14 05/29/08 6.00 28.27 109440 3870 4
i
i
Comments: Tests conducted in general accordance with ASTM C 31, C 172, C 231, C 143, C 1064, C 39, and C 138 except initial
curing conditions not documented. j
If you have any questions please call WEINHOLD, JOEL at 864-297-9944.
i
i
REPORT DISTRIBUTION:
ARCHER WESTERN CONTRACTORS 1 MR. MICHAEL CARLIN (A-1) TYPES OF FRACTURES i
CARLISLE ASSOCIATES \ MR. EUGENE J. RESCH, P.E. (A-1) i ,
CLARY HOOD, INC \ MR. ANDY PAINTER (A-1) b
1 2 3 4 5 6
3
i
Page: 1 of 1
QO RETA
PROPERTY SCIENCES
281 Fairforest Way / Greenville, SC 29607 / 864-297-9944 / 864-297-0462
CYLINDER STRENGTH REPORT
Job No: CH6051 Molded: 05/15/08 Prepared: 05/23/08
Lab No: 127371 Received: 05116/08 Date: 06/03/08
Project: TARGET DISTRIBUTION CENTER
Client: ARCHER WESTERN CONTRACTORS
Contractor: FLORCON
Technician: BILLY YOUNG
Concrete Supplier: KERR
Design Mix No: T52467 Strength Requirement: 3500 PSI Tested @ (Days): 28
Location of Pour: Pour No. 6 from QQ to LL and 4.6 and 3.4
Truck No.: 12 No. of Specimens: 5 Slump: 5-112 inches
Ticket No: 1398 Set No: 3 of 6 Air Content: 0.8 %
Time Batched: 7:15 Quantity: 300/51640 Unit Wt: 144.6 pcf
Water Added on Job: 0 gals Time Molded: 8:15 Concrete Temp: 70 F
Water Requested By: - Atmosphere Temp: 60 F
Specimen Age Date Diameter Area Maximum Strength Type of
(psi) Fracture Remarks
Number (days Tested (ins) (sq ins) Load
1 7 05122/08 6.00 28.27 90647 3210 4
2 14 05/29/08 6.00 28.27 109842 3860 4
i
i
3
Comments: Tests conducted in general accordance with ASTM C 31, C 172, C 231, C 143, C 1064, C 39, and C 138 except initial ~
curing conditions not documented.
i
I
If you have any questions please call WEINHOLD, JOEL at 864-297-9944.
REPORT DISTRIBUTION:
ARCHER WESTERN CONTRACTORS 1 MR. MICHAEL CARLIN (A-1) TYPES OF FRACTURES
CARLISLE ASSOCIATES 1 MR EUGENE J. RESCH, P.E. (A-1)
i
CLARY HOOD, INC \ MR. ANDY PAINTER (A-1)
3i ttil }hh
v;1
1 2 3 4 5 6
t
I
i
Page: 1 of 1
O R EILI
S
PROPERTY SCIENCES
281 Fairforest Way / Greenville, SC 29607 / 864-297-9944 / 864-297-0462
CYLINDER STRENGTH REPORT
Job No: CH6051 Molded: 05115/08 Prepared: 05/23/08
Lab No: 127370 Received: 05116/08 Date: 06/03108
Project: TARGET DISTRIBUTION CENTER
Client: ARCHER WESTERN CONTRACTORS
Contractor: FLORCON
Technician: BILLY YOUNG
i
Concrete Supplier: KERR
Design Mix No: T52467 Strength Requirement: 3500 PSI Tested @ (Days): 28
Location of Pour: Pour No. 6 from QQ to LL and 3.4 to 2.6 j
Truck No.: 14 No. of Specimens: 5 Slump: 5-112 inches
Ticket No: 1413 Set No: 4 of 6 Air Content: 0.9 %
Time Batched: 9:14 Quantity: 45015/640 Unit Wt: 148.3 pef
Water Added on Job: 0 gals Time Molded: 10:15 Concrete Temp: 72 F
Water Requested By: - Atmosphere Temp: 62 F
i
Specimen Age Date Diameter Area Maximum Strength Type of
Number (days) Tested (ins) (sq ins) Load (psi) Fracture Remarks
(Ibs) s
1 7 05/22108 6.00 28.27 100009 3540 - 4 j
2 14 05/29/08 6.00 28.27 114215 4040 4 I
I
i
Comments: Tests conducted in general accordance with ASTM C 31, C 172, C 231, C 143, C 1064, C 39, and C 136 except initial
curing conditions not documented.
If you have any questions please call WEINHOLD, JOEL at 864-297-9944.
p
REPORT DISTRIBUTION. I
ARCHER WESTERN CONTRACTORS \ MR. MICHAEL CARLIN (A-1) TYPES OF FRACTURES
CARLISLE ASSOCIATES \ MR. EUGENE J. RESCH, P.E. (A-1) 1 Si i
CLARY HOOD, INC \ MR. ANDY PAINTER (A-1) x 1 1 1 ti h A 'f )
f~ 1` V1'1 1 r x
i
1 2 3 4 5 6
Page: 1 of 1
ORETM
P R OF E R T Y S C I E N C E S
281 Fairforest Way/ Greenville, SC 29607 / 864297-9944 / 864-297-0462
CYLINDER STRENGTH REPORT
Job No: CH6051 Molded: 05115/08 Prepared: 05/23108
Lab No: 127369 Received: 05116/08 Date: 06/03108
Project: TARGET DISTRIBUTION CENTER
Client: ARCHER WESTERN CONTRACTORS
Contractor: FLORCON
Technician: BILLY YOUNG
Concrete Supplier. KERR
Design Mix No: T52467 Strength Requirement: 3500 PSI Tested @ (Days): 28
Location of Pour. Pour No. 6 from QQ to LL and 2.6 to 2.1
i
's
Truck No.: 602 No. of Specimens: 5 Slump: 5-314 inches
Ticket No: 1432 Set No: 5 of 6 Air Content: 1.1 %
Time Batched: 11:44 Quantity: 60015/640 Unit Wt: 149.0 pcf
Water Added on Job: 0 gals Time Molded: 12:45 Concrete Temp: 73 - F
Water Requested By: - Atmosphere Temp: 65 - F j
Specimen Age Date Diameter Area Maximum Strength Type of
Number (days) Tested (ins) (sq ins) o ; (psi) Fracture Remarks
(
1 7 05/22/08 6.00 28.27 94404 3340 ' '4
2 14 05/29/08 6.00 28.27 108950 3850 4
I
i
I
3
S
i
i
F
0
Comments: Tests conducted in general accordance with ASTM C 31, C 172, C 231, C 143, C 1064, C 39, and C 138 except initial
curing conditions not documented.
a
If you have any questions please call WEINHOLD, JOEL at 864-297-9944.
REPORT DISTRIBUTION.
ARCHER WESTERN CONTRACTORS 1 MR. MICHAEL CARLIN (A-1) TYPES OF FRACTURES
CARLISLE ASSOCIATES \ MR. EUGENE J. RESCH, P.E. (A-1)
CLARY HOOD, INC 1 MR. ANDY PAINTER (A-1) l I ' I '
1k i
1 2 3 4 5 6