Loading...
HomeMy WebLinkAboutAUTH-03-2018-095860.TIF 61./1 eAOWA AN) . (?-5u" The dear leader. • AQWA Inc. 2604 Willis Court,Wilson, NC 27896 • Phone: 252-243-7693-Email: agwatammysanders@gmail.com Customer Name: Sherrill Date of Inspection: 9/29/2022 Address: Sherrill-6944 Ingleside Drive Sherrill Ford,NC 28673 Arrival Time: 12:45:00 PM System AX ID: AX-149567 Departure Time: 3:45:00 PM County: Catawba Permit No. Inspection and Maintenance Checklist-AX-RT with LPP or P-Manifold or D-BOX sat fir`.. 1a i 11r 5 "@�gypp° pus-" '' @p N,A€1 ;..1t i � � ! t , �� �;E K£x �.s�'ia9i,f. � .......,..: �<, a..< a '. -,�,U i.,W) -.. Tank At Site Tank 1 Tank 1 Inlet Readings Tank 2 Inlet Readings 0 Scum 2 Sludge Scum Sludge Tank 1 Outlet Readings Tank 1 Outlet Readings 0 Scum 2 Sludge Scum Sludge Clean Effluent Filler: Cleaned Check for Influent or Effluent Blockages: No Blockage Inspect Tank/Riser for Leaks: None Seen Control Panel Inspection Check Pump Operates In Manual Mode: Yes Recirculation Pumps Recirculation Pump 1 Pump 1 Timer Settings Pump 1-Counters and Elapsed Time Meters 0.8 Dose 10 Rest 9683 CT 131 ETM Dose Pumps Pump 1 Timer Settings Pump 1-Counters and Elapsed Time Meters Demand Dose Demand Rest 93 CT 503.1 ETM Verify Conduit Seal: Added . 11,.. AX-RT Treatment Pod lrfs' tfon Inspect for Ponding or Bridging: None Check and Record PSI: 4.5 Verify Orifice Position and Assess for Clogging: Cleaned Check for Odors: None Clean,Brush,Flush Lateral: Done Recheck and Record PSI 4.5 Flush Pod Throroughly: Done Inspect and Clean Vents: Cleaned Inspection and Maintenance Checklist-AX-RT with LPP or P-Manifold or DBOX Recircul ation Chamber inspection,. Verify Inlet Flow: Inflow Inspect Liquid: Normal Level Record Scum/Sludge Levels: Inlet Readings: Outlet Readings: 0 Scum 2 Sludge 0 Scum 2 Sludge Inspect Tank/Riser for Leakage: None Seen Verify All Floats Work: Replace Floats,See Notes Pump Sludge to Septic Tank: Not Needed Verify Audible Alarm Works for High Water float: Works Properly Pull Pump and Clean Screen: Cleaned Verify Neat Wrap of Float and Pump Cords: Checked Verify No Leaking In Piping or Flex Hoses: Repaired,See Notes Verify Conduit Seal: Verified Ultraviolet Disinfection Unit inspection Does System Have a UV? Yes How.Many UV Disinfectant Units Present? UV 1 After Disconnecting Power,Clean or Replace Bulb As Needed: Replaced Flush Housing Thoroughly: Flushed Return Power and Verify Proper Function: UV Repaired,See Notes Dosing,Chamber inspection Inspect for Tank/Riser Leakage: None Seen Inspect Liquid: Normal Level Record Scum/Sludge Levels: Inlet Readings: Outlet Readings: Scum Sludge 0 Scum 2 Sludge Visually Check Liquid Level: Normal Verify Audible Alarm Works for High Water float: Works Properly Verily No Leaks In Piping or Flex Hoses: Repaired,See Notes Verify Neat Wrap of Float and Pump Cords. Checked Inspect Pump Intake Cleaned Delivery Rate at Start Up: 19 Verify All Floats Wo'k Cperat:ng Properly Verify Conduit Seal: Added LPP or P-Manifold or DBOX Inspection Areas Mowed and Clear of Obstruction Yes Flush Laterals: Not a LPP Area Free of Ponding or Surface Effluent: Yes Set and Record Head Pressure: N/A Curtain Drains,Ditches,Swales Functioning Properly: Yes Check Hardware: Functioning Properly Current Delivery Rate: 19.25 Pump Efficiency: 101 Return Valves and Control Panel 10 proper settings Done Lantronics showing correct lights.Did not call in while onsite.Last Control Panel Communication Checked: called in 9/16/22 inspection Notes Dose splice box was full of water.Deed out box and found that it is missing a plug.Put conduit seal to try to and keep water out until we can return with a plug.Top cap of uv is cracked and needs replaced.Uv cord is burnt needs replaced 50ft cord.Will have to return with replacement cord. Connor Gavin Operator Operators Signature AQIWA me clear leader. AQWA Inc. - Q1 2604 Willis Court,Wilson, NC 27896 V Phone: 252-243-7693 — Email: aqwatammysanders@gmail.com Customer Name: Sherrill Date of Inspection: 2/2212023 Address: Sherrill-6944 Ingleside Drive Sherrill Ford,NC 28673 Arrival Time: 1:15:00 PM System AX ID: AX-149567 Departure Time: 2:45:00 PM County: Catawba Permit No. Inspection and Maintenance Checklist-AX-RT with LPP or P-Manifold or D-BOX Septic Tank Inspection Tank At Site Tank 1 lank 1 Inlet Readings Tank 2 Inlet Readings 1 Scum 15 Sludge Scum Sludge Tank 1 Outlet Readings Tank 1 Outlet Readings 0 Scum 14 Sludge Scum Sludge Tank inspection Questions Tank 1 Tank 2 Clean Effluent Filter: Cleaned Check for Influent or Effluent Blockages: No Blockage Inspect Tank/Riser for Leaks: None Seen Control Panel Inspection Check Pump Operates In Manual Made: Yes Recirculation Pumps Recirculation Pump 1 Pump 1 Timer Settings Pump 1-Counters and Elapsed Time Meters 0.8 Dose 10 Rest 29150 CT 393.5 ETM Dose Pumps Pump 1 Timer Settings Pump 1-Counters and Elapsed Time Meters Demand Dose Demand Rest 284 CT 515.5 FTM Verify Conduit Seal: Verified AX-RT Treatment Pod Inspection Pod Inspection .f. Inspect for Ponding or Bridging: None Check and Record PSI: 4.5 Verify Orifice Position and Assess for Clogging: Cleaned Check for Odors: Foul Odor Clean,Brush,Flush Lateral: Done Recheck and Record PSI 4.5 Flush Pod Throroughly: Done Inspect and Clean Vents: Cleaned Inspection and Maintenance Checklist-AX-RT with LPP or P-Manifold or DBOX Recirculation Chamber Inspection Verify Inlet Flow: No Inflow Inspect Liquid: Normal Level Record Scum/Sludge Levels: Inlet Readings: Outlet Readings: 0 Scum 2 Sludge 0 Scum 3 Sludge Inspect Tank/Riser for Leakage: None Seen Verify All Floats Work: Operating Properly Pump Sludge to Septic Tank: Not Needed Verify Audible Alarm Works for High Water float: Works Properly Pull Pump and Clean Screen: Cleaned Verify Neat Wrap of Float and Pump Cords: Checked Verify No Leaking In Piping or Flex Hoses: None Seen Verify Conduit Seal: Verified Ultraviolet Disinfection Unit Inspection Does System Have a UV? Yes How Many UV Disinfectant Units Present? UV 1 lb/Disinfectant Unit Inspection UV 1 • After Disconnecting Power.Clean or Replace Bulb As Needed: Cleaned Flush Housing Thoroughly: Flushed Return Power and Verify Proper Function: Verified Dosing Chamber Inspection _ Inspect for Tank/Riser Leakage: None Seen Inspect Liquid: Normal Level Record Scum/Sludge Levels: Inlet Readings: Outlet Readings: Scum Sludge 0 Scum 0 Sludge Visually Check Liquid Level: Normal Verify Audible Alarm Works for High Water float: Works Properly Verify No Leaks In Piping or Flex Hoses: None Seen Verify Neat Wrap of Float and Pump Cords: Checked Inspect Pump Intake: Cleaned Delivery Rate at Start Up: 19 Verify All Floats Work: Operating Properly Verify Conduit Seal: Verified LPP or P-Manifold or DBOX Inspection Areas Mowed and Clear of Obstruction: Yes Flush Laterals: Not a LPP Area Free of Ponding or Surface Effluent: Yes Set and Record Head Pressure: N/A Curtain Drains,Ditches,Swales Functioning Properly: Yes Check Hardware: Functioning Property Current Delivery Rate: 18.7 Pump Efficiency: 98 Retum Valves and Control Panel to proper settings Done Control Panel Communication Checked: Panel called In. Inspection Notes Septic tank has high level of solids.Please schedule to have your septic tank pumped at your convenience.8.5.4.4=37.4+2=18.7 Paul Smith Operator Operators Signature !AQWA 4 J1 The clear leader -D 9,5 s V AQWA Inc. 2604 Willis Court,Wilson, NC 27896 Phone: 252-243-7693—Email: aqwatammysanders@gmail.com Customer Name: Sherrill Date of Inspection: 8/16/2023 Address: Sherrill-6944 Ingleside Drive Sherrill Ford,NC 28673 Arrival Tme: 10:15:00 AM System AX ID: AX-149567 Departure Time. 11:45:00 AM County: Catawba Permit No. Inspection and Maintenance Checklist-AX-RT with I PP or P-Manifold or D-BOX Septic Tank Inspection Tank At Site Tank 1 Tank 1 Inlet Readings lank 2 Inlet Readings 1 Scum 6 Sludge Scum Sludge Tank 1 Outlet Readings lank 1 Outlet Readings 0 Scum 4 Sludge Scum Sludge .._. .. ... ..... ..,..iNr -,.._...e... . ...._. n�w,.v''+..il.r.Y...v�ldN.✓Mv l5Sr�4el�$ .W3J'a...: Clean Effluent Filter: Cleaned Check for Influent or Effluent Blockages: No Blockage Inspect Tank/Riser for Leaks: None Seen Control Panel Inspection Check Pump Operates In Manual Mode: Yes Recirculation Pumps Recirculation Pump 1 Pump 1 Tmer Settings Pump 1-Counters and Elapsed Time Meters 0.8 Dose 10 Rest 52526 CT 708.8 ETM Dose Pumps Pump 1 Tmer Settings Pump 1-Counters and Elapsed Tme Meters Demand Dose Demand Rest 553 CT 532.2 ETM Verify Conduit Seal: Verified AX-RT Treatment Pod inspection Inspect for Ponding or Bridging: None Check and Record PSI: 4.5 Verify Orifice Position and Assess for Clogging: Cleaned Check for Odors None Clean,Brush,Flush Lateral. Done Recheck and Record PSI 4.5 Flush Pod Throroughly: Done Inspect and Clean Vents: Cleaned Inspection and Maintenance Checklist-AX-RT with LPP or P-Manifold or DBOX Recirculation Chamber Inspection Verify Inlet Flow No Inflow Inspect Liquid Normal Level Record Scum/Sludge Levels: Inlet Readings: Outlet Readings: 0 Scum 0 Sludge 0 Scum 1 Sludge Inspect Tank/Riser for Leakage: None Seen Verify All Floats Work: Operating Properly Pump Sludge to Septic Tank: Not Needed Verify Audible Alarm Works for High Water float: Works Property Pull Pump and Clean Screen: Cleaned Venfy Neat Wrap of Float and Pump Cords: Checked Verify No Leaking In Piping or Flex Hoses: None Seen Verify Conduit Seal: Verified Ultraviolet Disinfection Unit Inspection Does System Have a UV? Yes How Many UV Disinfectant Units Present? UV 1 After Disconnecting Power,Clean or Replace Bulb As Needed: Replaced Flush HousIng Thoroughly: Flushed Return Power and Verify Proper Function: Verified Dosing Chamber Inspection Inspect for Tank/Riser Leakage: None Seen Inspect Liquid: Normal Level Record Scum/Sludge Levels: Inlet Readings: Outlet Readings: Scum Sludge 0 Scum 0 Sludge Visually Check Liquid Level: Normal Verify Audible Alarm Works for High Water float: Works Property Verify No Leaks In Piping or Flex Hoses: None Seen Verify Neat Wrap of Float and Pump Cords: Checked Inspect Pump Intake: Cleaned Delivery Rate at Start Up: 19 Verify All Floats Work: Operating Properly Verify Conduit Seal: Verified LPP or P-Manifold or DBOX Inspection Areas Mowed and Clear of Obstruction: Yes Flush Laterals: Not a LPP Area Free of Ponding or Surface Effluent: Yes Set and Record Head Pressure: N/A Curtain Drains,Ditches,Swales Functioning Properly: Yes Check Hardware: Functioning Properly Current Delivery Rate: 18.4 Pump Efficiency: 98 Return Valves and Control Panel to proper settings Done Control Panel Communication Checked: Panel called in. Inspection Notes 39-47.5=8.5x4 x4=37.4+2=18.7 T— Paul Smith Operator Operators Signature oJ4\ -03 IDS-0953730 AQWA The clear leader. AQWA Inc. 2604 Willis Court,Wilson,NC 27896 Phone:252-243-7693—Email:aqwatammysanders@gmail.com Customer Name: Sherrill Date of Inspection: 10/29/2025 Address: Sherrill-6944 Ingleside Drive Sherrill Ford,NC 28673 Arrival Time: 2:38:00 PM System AX ID: AX-149567 Departure Time: 4:26:00 PM County: Catawba Permit No. Inspection and Maintenance Checklist-=AX-RT with LPP or P=Manifold or D-BOX Septic Tank Inspection Tank At Site Tank 1 Tank 1 Inlet Readings Tank 2 Inlet Readings 0 Scum 6 Sludge Scum Sludge Tank 1 Outlet Readings Tank 1 Outlet Readings 0 Scum 6 Sludge Scum Sludge Tank inspection Questions Tank 1, " Tank.2' Clean Effluent Filter: Cleaned Check for Influent or Effluent Blockages: No Blockage Inspect Tank/Riser for Leaks: None Seen Control Panel Inspection Check Pump Operates In Manual Mode: Yes Recirculation Pumps Recirculation Pump 1 Pump 1 Timer Settings Pump 1-Counters and Elapsed Time Meters 0.8 Dose 10 Rest 59614 CT 2151.6 ETM Dose Pumps Pump 1 Timer Settings Pump 1-Counters and Elapsed Time Meters Demand Dose Demand Rest 1528 CT 596.7 ETM Verify Conduit Seal: Verified AX-RT Treatment Pod Inspection Pod Inspection' p° 'Pod 1' Inspect for Ponding or Bridging: None Check and Record PSI: Verify Orifice Position and Assess for Clogging: Cleaned Check for Odors: None Clean,Brush,Flush Lateral: Done Recheck and Record PSI Flush Pod Throroughly: Done Inspect and Clean Vents: Vents Clear Inspection and Maintenance Checklist-AX-RT with LPP or P-Manifold or DBOX Recirculation Chamber Inspection Verify Inlet Flow: No Inflow Inspect Liquid: Normal Level Record Scum/Sludge Levels: Inlet Readings: Outlet Readings: 0 Scum 2 Sludge 0 Scum 1 Sludge Inspect Tank/Riser for Leakage: None Seen Verify All Floats Work: Operating Properly Pump Sludge to Septic Tank: Not Needed Verify Audible Alarm Works for High Water float: Works Properly Pull Pump and Clean Screen: Cleaned Verify Neat Wrap of Float and Pump Cords: Checked Verify No Leaking In Piping or Flex Hoses: None Seen Verify Conduit Seal: Verified Ultraviolet Disinfection Unit Inspection Does System Have a UV? Yes How Many UV Disinfectant Units Present? UV 1 UV Disintectant Unitlnspection ; UV 1, _ UV2 After Disconnecting Power,Clean or Replace Bulb As Needed: Cleaned Flush Housing Thoroughly: Flushed Return Power and Verify Proper Function:, Verified Dosing Chamber Inspection Inspect for Tank/Riser Leakage: None Seen Turbidity Reading: 0.00 Inspect Liquid: Normal Level Record Scum/Sludge Levels: Inlet Readings: Outlet Readings: Scum Sludge 0 Scum 1 Sludge Visually Check Liquid Level: Normal Verify Audible Alarm Works for High Water float: Works Properly Verify No Leaks In Piping or Flex Hoses: None Seen Verify Neat Wrap of Float and Pump Cords: Checked Inspect Pump Intake: Ok Delivery Rate at Start Up: 19 Verify All Floats Work: Operating Properly Verify Conduit Seal: Verified LPP or P-Manifold or DBOX Inspection Areas Mowed and Clear of Obstruction: Yes Flush Laterals: Not a LPP Area Free of Ponding or Surface Effluent: Yes Set and Record Head Pressure: N/A Curtain Drains,Ditches,Swales Functioning Properly: Yes Check Hardware: Functioning Properly Current Delivery Rate: 18.7 Pump Efficiency: 98 Return Valves and Control Panel to proper settings Done Control Panel Communication Checked: Panel called In Inspection Notes 41-49.50=8.5x4.4=37.4+2=18.7+19=98%Tested internet connection with tablet and ethernet adapter.Had to cycle power to get panel to call in. Blake Efird Operator Operators Signature