MACKIE JOHNSON, ARCHITECT j
OFFICE: 828-464-1028 FAx: 828-465-4562
MAILING ADDRESS SHIPPING ADDRESS
P. 0. Box 428 11 4T" AVENUES W
CONOVER, N. C. 28613 ONOVER, N. C. 28613
MJA@MACKIEJOHNSON.COM
FEBRUARY 18, 2009
PROJECT CONSTRUCTION MEMO (PLAN REVIEW COMMENTS)
NUMBER (RESPONSE TO CODE COMMENTS DATED 01-29-10)
DELIVERY: HAND DELIVERY - ONLY
PROJECT: INTERIOR ALTERATIONS FOR:
CHILD DEVELOPMENT SERVICES ASSOCIATION
1985 S.E. TATE BLVD.
HICKORY, NORTH CAROLINA
CONTRACTOR: DAVID E. LOOPER & COMPANY, INC.
FROM: BARRY (CARD, AIA - MACKIE JOHNSON, ARCHITECT
TO: CATAWBA COUNTY- CLARA COULBOURNE
HICKORY DEVELOPMENT ASSISTANT CENTER
COPY TO: DAVID E. LOOPER & COMPANY, INC.
REFERENCE: REPLY TO REVIEW COMMENTS DATED 01-29-10
PLANNING AND ZONING COMMENTS: (N/A)
ENGINEERING STATUS: (N/A)
BUILDING STATUS: (DISAPPROVED)
COMMENT #1: SHEETS A1.0: PROVIDE DETAILED CONSTRUCTION COST TO SHOW 20%
DISPROPORTIONALITY COST AND HOW IT IS BEING SPENT PER NCBC 3409.7(1)
(SEE REVISED DRAWING A1.0, A3.0 AND ATTACHED INFORMATION FROM DAVID
E. LOOPER, INC. FOR COMPLIANCE)
COMMENT #2: SHEETS E-2: MOVE EXIT SIGNS AT DOOR A402 TO DOOR A400 (EXIT THRU
WAITING AREA) TO PREVENT MERGING OF EXITS FROM CONFERENCE ROOM.
(SEE REVISED ELECTRICAL DRAWINGS FOR COMPLIANCE)
PAGE 1 OF 2
F
c- 10-3683
COMMENT #3: GENERAL NOTE: THE FIRE DAMPERS SHOWN ALONG CORRIDOR A414 ARE NOT
REQUIRED BY THE BUILDING CODE AS THE CORRIDOR IS NOT A RATED CORRIDOR
PER NCBC. TABLE 1017.1 FOOTNOTE "F".
(SEE REVISED MECHANICAL DRAWINGS
FIRE STATUS: (PLAN RECEIVED-APPROVED WITH NOTES
COMMENT #1: THE RATED DOOR WILL NOT BE REMOVED SEPARATING CORRIDOR A414 AND
A407. FIRE DOOR SHALL BE LABELED ACCORDING TO THEIR INTENDED USE.
COMMENT #2: WILL VERIFY ALL DOORS IN RATED WALLS ARE PROVIDING OR MAINTAINING
PROPER OPENING PROTECTIONS.
COMMENT #2: THE DIRECTION OF EXIT SIGN IN CORRIDOR A402 WILL BE RELOCATED SUCH
THAT IT WOULD DIRECT OCCUPANTS THROUGH WAITING AREA A400..
ATTACHMENTS: FOUR SETS OF REVISED DRAWINGS ONLY.
PAGE 2OF2
END OF RESPONSE TO CODE COMMENTS DATED 01-29-10
C6P#,-1-10 3683
CDSA
20% Disproportional ity Cost Breakdown
Total Contract Before Disproportionality $66,245.00
20% Disproportionality Cost $13,249.00
Men's Gang Bathroom Upgrades
General Conditions $1,024.00
Patch Ceramic Tile $375.00
Patch Plaster Ceilings $1,000.00
Add New Toilet Partition $1,470.00
Remove One Toilet, Add One New ADA Sink $3,985.00
Total $7,854.00
Add New Bi-level Water Cooler
General Conditions $608.00
Demo Existing and Add new Backer Board $1,200.00
Material and Labor New Bi-level Water Cooler $2,853.00
Total $4,661.00
Add New Handicap Sign Parking Spaces
General Condition $135.00
Labor and Material to add Signage $900.00
Total $1,035.00
Total for Both Changes $13,550.00
i
5