Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Ranier.xlsx
PUMP REQUIRENMENTS: Pressure Head Total Flow # of Taps Elevation Head Supply Line Length Friction Loss @ Total GPM 2" sch.40 Friction Head TDH Linear Footage: Pump Run Time: 5 21 110 250 35 2 Sch. 40 35.55 110 2.37 3.1284 28.1284 2 ft Head 3.42827004219409 gpm @ 2 Sch. 80 27.4 110 0.9 1.188 26.188 Dosing Volume: Draw Down: 28 3 Sch. 40 43.55 110 0 26 TDH 3 Sch. 80 33.55 110 0 26 121.875 5.80357142857143 3ft Head 3.63263785394933