Loading...
HomeMy WebLinkAboutOP-11-09-2672.TIFDrain Field: System Final Inspection Log: Septic Tank: 1111112009 Recieved phone call from Merle Long (of Chad Gooden Custom Homes) that previously existingtold septic tank has peen crushed and filled. He said that it was pumped out. partially crushed. then filled with concrete. The entire area was then packed with dirt. Pump Tank.- Supply Line: Pump Requirements: Electrical Equipment: