HomeMy WebLinkAboutCBPR-10-09-2314 Employees per shift info 10-5-09.tif
s
'r
October 5, 2004
Town of Maiden,
During normal weekday operations after completion of the construction project we antici-
pate that our personnel per shift will be as follows:
1. Day Shift 36 personnel
2. Swing Shift 6 personnel
3. Grave Shift 4 personnel
There will be an approx 1-2 hour shift overlap so worst case scenario in terms of maximum
personnel on-site would be approximately 42.
Weekend staffing will be similar to weekday Swing Shift for the Day and Swing Shifts and
Grave Shift would be the same whether weekday or weekend.
Please let me know if you have any questions. Thank you.
Donald 3 Meister, PE
Dir, Facility Operations
Apple
1 Infinite Loop
Cupertino, CA 95014
T 408-595-7957
www.apple.com
Plumbing Fixture Requirements
Case 1: Using Design Occupant Load
Accessory Storage Areas 491,400 sf @ 300 sf/occ. = 1638 occ.
Business Areas 13,200 sf @ 100 sf/occ. = 132 occ.
Total 504,600 sf 1770 occ.
Water Closets Lavatories
Male Female Male Female Showers Drinking Fountains Service Sink
37 24 - 18 1
Case 2: Usin Shown Office Seating Counts
Total 70 occ.
Water Closets Lavatories
Male Female Male Female Showers Drinking Fountains Service Sink
3 2 - 1 1
Case 3: Using Ex ected Occupants per Shift
Day 36 occ.
Swing 6 occ.
Graveyard 4 occ.
Total 42 occ.
'Total calculated using the maximum number of
occupants during a shift change (Day + Swing shift)
Water Closets Lavatories
Male Female Male Female Showers Drinking Fountains Service Sink
2 2 - 1 1
i
ACTUAL FIXTURES PROVIDED
Water Closets Lavatories
Male Female Male Female Showers Drinking Fountains Service Sink
12, 10 - 2 2