Loading...
HomeMy WebLinkAboutCBPR-10-09-2314 Employees per shift info 10-5-09.tif s 'r October 5, 2004 Town of Maiden, During normal weekday operations after completion of the construction project we antici- pate that our personnel per shift will be as follows: 1. Day Shift 36 personnel 2. Swing Shift 6 personnel 3. Grave Shift 4 personnel There will be an approx 1-2 hour shift overlap so worst case scenario in terms of maximum personnel on-site would be approximately 42. Weekend staffing will be similar to weekday Swing Shift for the Day and Swing Shifts and Grave Shift would be the same whether weekday or weekend. Please let me know if you have any questions. Thank you. Donald 3 Meister, PE Dir, Facility Operations Apple 1 Infinite Loop Cupertino, CA 95014 T 408-595-7957 www.apple.com Plumbing Fixture Requirements Case 1: Using Design Occupant Load Accessory Storage Areas 491,400 sf @ 300 sf/occ. = 1638 occ. Business Areas 13,200 sf @ 100 sf/occ. = 132 occ. Total 504,600 sf 1770 occ. Water Closets Lavatories Male Female Male Female Showers Drinking Fountains Service Sink 37 24 - 18 1 Case 2: Usin Shown Office Seating Counts Total 70 occ. Water Closets Lavatories Male Female Male Female Showers Drinking Fountains Service Sink 3 2 - 1 1 Case 3: Using Ex ected Occupants per Shift Day 36 occ. Swing 6 occ. Graveyard 4 occ. Total 42 occ. 'Total calculated using the maximum number of occupants during a shift change (Day + Swing shift) Water Closets Lavatories Male Female Male Female Showers Drinking Fountains Service Sink 2 2 - 1 1 i ACTUAL FIXTURES PROVIDED Water Closets Lavatories Male Female Male Female Showers Drinking Fountains Service Sink 12, 10 - 2 2