SEDIMENTATION INSPECTION REPORT CATAWBA COUNTY UTILITIES & ENGINEERING DEPARTMENT PO Box 389, Newton, NC 28658 (828) 465-8161 FAX (828) 465-8392 Project Single Family Dwelling Project
Number Case-11-09-1211 Person Financially Responsible Kaanh Le Address 602 46th Ave Dr NE, Hickory, NC 28601-7318 1. Project Location 4115 9th St NE, Hickory, NC 28601 Pictures: Prints
Slides Digital Video 2. Weather and Soil Conditions Overcast, muddy 3. Is site currently under notice of violation? Yes No If no, check violations below: 5. Violations (refer to Catawba
County Local Ordinance Chapter 31): a. No approved plan 31-4 ( c ) g. Inadequate buffer zone 31-5 (a) (1) b. Failure to follow approved plan 31-5 (f) h. Graded slopes and fills too steep
31-5 (b) c. Failure to submit revised plan 31-6 (m) i. Unprotected exposed slopes 31-5 (b) d. Failure to provide adequate groundcover 31-5 (d) j. Failure to maintain erosion control
measures 31-13 e. Insufficient measures to retain sediment on site 31-7 (e) k. Notice of activity initiation 31-6 (j) f. Failure to take all reasonable measures 31-4 (d) l. Other (describe):
6. Phase of Grading a. rough grading complete b. final grading complete Description: 7. Potential NPDES Permit violation? Yes No Describe 8. Has sedimentation damage occurred? Yes If
yes, where? (check all that apply) No Lake/natural watercourse on the tract Lake/natural watercourse off the tract Other property Road/walkway Description: No erosion control measures
in place to prevent offsite sediment runoff in roadway or adjacient properties. Degree of damage: Slight Moderate Severe 9. Contact made with (name)n/a Title Inspection report in case
file due to no activity given or sent to Person Financially Responsible. Date given/sent: 11-25-09 10. Corrective actions needed: Install erosion control measures ASAP. Submit an adequate
sedimentation and erosion control plan for approval, covering all areas disturbed or to be disturbed. Submit a revised sedimentation and erosion control plan for approval for the following
areas: Install all sedimentation and erosion control measures as shown on the approved plan, including but not limited to the following locations: Install temporary sediment traps, basins
and rock dams and associated diversions as shown on the approved plan, including but not limited to the following locations: Install erosion and sediment control devices sufficient to
retain sediment on the tract: To prevent off site sediment runoff. Install adequate drop inlet protection as shown on the approved plan, including but not limited to the following locations:
Provide adequate temporary or permanent ground cover on all graded slopes where rough or fine grading has been completed for 21 calendar days, including the following areas: Provide
adequate permanent ground cover on all areas where development has been completed for 15 working or 90 calendar days, whichever is shorter (15 working or 60 calendar days, whichever
is shorter, in High Quality Waters): Maintain all sedimentation and erosion control measures as specified in the approved plan and as required to prevent sedimentation damage including
the following locations: 11. Comments: No activity since last inspection: Report by: Kim Sue Others present: Date of inspection: 11-24-09 Time arriving at site: 12:45 pm Time leaving
site: 1:00 pm cc: , ,