Loading...
HomeMy WebLinkAboutAUTH-05-2016-072174.TIF A)1 4 hp—TN-it/ IAQIWA The clear leader. AQWA Inc. 2604 Willis Court,Wilson, NC 27896 Phone: 252-243-7693—Email:aqwatammysanders@gmail.com Customer Name: Herrin Date of Inspection: 6/17/2022 Address: Herrin-4104 Wilkerson Drive Claremont,NC 28610 Arrival Time: 7:40:00 AM System AX ID: AX-140199 Departure Time: 8:50:00 AM County: Catawba Permit No. Inspection and Maintenance Checklist-AX-RT with LPP or P-Manifold or D-BOX Septic Tank Inspection Tank At Site Tank 1 Tank 1 Inlet Readings Tank 2 Inlet Readings 0 Scum 10 Sludge Scum Sludge Tank 1 Outlet Readings Tank 1 Outlet Readings 0 Scum 8 Sludge Scum Sludge ..t I",!. a tit��:�rt�. .., :6. e �t "'iia F +� ,e,�^�t'ai;'k.,F;+...� Clean Effluent Filter: Cleaned Check for Influent or Effluent Blockages: No Blockage Inspect Tank/Riser for Leaks: None Seen Control Panel Inspection Check Pump Operates In Manual Mode: Yes Recirculation Pumps Recirculation Pump 1 Pump 1 Timer Settings Pump 1-Counters and Elapsed Time Meters 0.8 Dose 10 Rest 27815 CT 1732 ETM Dose Pumps Pump 1 Timer Settings Pump 1-Counters and Elapsed Time Meters Demand Dose Demand Rest 50 CT 3 ETM Verify Conduit Seal: Verified AX-RT Treatment Pod Inspection Inspect for Ponding or Bridging: None Check and Record PSI: 4.5 Verify Orifice Position and Assess for Clogging: Cleaned Check for Odors: None Clean,Brush,Flush Lateral: Done Recheck and Record PSI 4.5 Flush Pod Throroughly: Done Inspect and Clean Vents: Cleaned Inspection and Maintenance Checklist-AX-RT with LPP or P-Manifold or DBOX Recirculation Chamber Inspection Verify Inlet Flow: No Inflow Inspect Liquid: Normal Level Record Scum/Sludge Levels: Inlet Readings: Outlet Readings: 0 Scum 2 Sludge 0 Scum 0 Sludge Inspect Tank/Riser for Leakage: None Seen Verify All Floats Work: Operating Properly Pump Sludge to Septic Tank. Not Needed Verify Audible Alarm Works for High Water float: Works Property Pull Pump and Clean Screen: Cleaned Verify Neat Wrap of Float and Pump Cords: Checked Verify No Leaking In Piping or Flex Hoses: None Seen Verify Conduit Seal: Verified Ultraviolet Disinfection Unit Inspection Does System Have a UV? Yes How Many UV Disinfectant Units Present? UV 1 . After Disconnecting Power,Clean or Replace Bulb As Needed: Cleaned Flush Housing Thoroughly: Flushed Return Power and Verify Proper Function: Verified Dosing Chamber Inspection Inspect for Tank/Riser Leakage: None Seen Inspect Liquid: Normal Level Record Scum/Sludge Levels: Inlet Readings: Outlet Readings: Scum Sludge 0 Scum 0 Sludge Visually Check Liquid Level: Normal Verify Audible Alarm Works for High Water float: Works Properly Verify No Leaks In Piping or Flex Hoses: None Seen Verify Neat Wrap of Float and Pump Cords: Checked Inspect Pump Intake: Cleaned Delivery Rate at Start Up: 21 Verify All Floats Work: Operating Properly Verify Conduit Seal: Verified LPP or P-Manifold or DBOX Inspection Areas Mowed and Clear of Obstruction: Yes Flush Laterals: Not a LPP Area Free of Ponding or Surface Effluent: Yes Set and Record Head Pressure: N/A Curtain Drains,Ditches,Swales Functioning Properly: Yes Check Hardware: Functioning Property Current Delivery Rate: 20.9 Pump Efficiency: 99 Return Valves and Control Panel to proper settings Done Control Panel Communication Checked: Panel called in inspection Notes 35.25-44.75=9.5 x4.4=41.8/2=20.9 gp m David Parker Operator Operators Signature AOWA The:lea'leader OD AQWA Inc. 2604 Willis Court,Wilson, NC 27896 Phone: 252-243-7693— Email: agwatammysanders@gmail.com Customer Name: Herne Date of Inspection: 6/20/2023 Address: Herrin-4104 Wilkerson Drive Claremont,NC 28610 Arrival Time: 10:55:00 AM System AX ID: AX-140199 Departure Time: 11:50:00AM County: Catawba Permit No. Inspection and Maintenance Checklist-AX-RT with LPP or P-Manifold or D-BOX Septic Tank Inspection Tank At Site Tank 1 Tank 1 Inlet Readings lank 2 Inlet Readings 0 Scum 7 Sludge Scum Sludge Tank 1 Outlet Readings Tank 1 Outlet Readings 0 Scum 6 Sludge Scum Sludge Clean Effluent Filter: Cleaned Check for Influent or Effluent Blockages: No Blockage Inspect Tank/Riser for Leaks: None Seen Control Panel Inspection Check Pump Operates In Manual Mode: Yes Recirculation Pumps Recirculation Pump 1 Pump 1 Timer Settings Pump 1-Counters and Elapsed Time Meters 0.8 Dose 10 Rest 76757 CT 2395.6 ETM Dose Pumps Pump 1 Timer Settings Pump 1-Counters and Elapsed Time Meters On demand Dose On demand Rest 97 CT 5.2 [TM Verify Conduit Seal. Verified AX-RT Treatment Pod Inspection .'�:�x': t`x,RYw"fY .i ire112,2C" • Inspect for Ponding or Bridging: None Check and Record PSI: 4.5 Verify Orifice Position and Assess for Clogging: Ok Check for Odors. None Clean,Brush,Flush Lateral: Done Recheck and Record PSI 4.5 Flush Pod Throroughly. Done Inspect and Clean Vents: Vents Clear Inspection and Maintenance Checklist-AX-RT with LPP or P-Manifold or DBOX Recirculation Chamber Inspection Verify Inlet Flow No Inflow Inspect Liquid: Normal Level Record Scum/Sludge Levels: Inlet Readings: Outlet Readings: 0 Scum 2 Sludge 0 Scum 1 Sludge Inspect Tank/Riser for Leakage: None Seen Verify All Floats Work: Operating Properly Pump Sludge to Septic Tank: Not Needed Verify Audible Alarm Works for High Water float: Works Properly Pull Pump and Clean Screen: Cleaned _ Verify Neat Wrap of Float and Pump Cords: Checked Verify No Leaking In Piping or Flex Hoses: None Seen Verify Conduit Seal: Verified Ultraviolet Disinfection Unit Inspection Does System Have a UV? Yes How Many UV Disinfectant Units Present? UV 1 After Disconnecting Power,Clean or Replace Bulb As Needed: Cleaned Flush Housing Thoroughly: Flushed Return Power and Verify Proper Function: Verified Dosing Chamber Inspection Inspect for Tank/Riser Leakage: None Seen Inspect Liquid: Normal Level Record Scum/Sludge Levels: Inlet Readings: Outlet Readings: Scum Sludge 0 Scum 1 Sludge Visually Check Liquid Level: Normal Verify Audible Alarm Works for High Water float: Works Properly Verify No Leaks In Piping or Flex Hoses: None Seen Verify Neat Wrap of Float and Pump Cords: Checked Inspect Pump Intake: Ok Delivery Rate at Start Up: 21 Verify All Floats Work: Operating Properly Verify Conduit Seal: Verified LPP or P-Manifold or DBOX Inspection Areas Mowed and Clear of Obstruction: Yes Flush Laterals: Not a LPP Area Free of Ponding or Surface Effluent: Yes Set and Record Head Pressure: N/A Curtain Drains,Ditches,Swales Functioning Properly: Yes Check Hardware: Functioning Properly Current Delivery Rate: 20.9 Pump Efficiency: 99 Return Valves and Control Panel to proper settings Done Did not call in while on site.Lantronics has power,status,and link solid green.The activity is blinking green.Please restore Internet service to Control Panel Communication Checked: the line to the panel.Site has not called In since May 2023. Inspection Notes 36-45.5=9.5.4.4=41.8/2=20.9/21=99% Jeff Cranmer Y Operator Operators Signature f ` !AOWA The°lea leader 0,..L)17,1 AQWA Inc. 2604 Willis Court,Wilson, NC 27896 Phone: 252-243-7693_ Email: aqwatammysanders@gmail.com Customer Name: Herrin Date of Inspection: 11/14/2023 Address: Herrin-4104 Wilkerson Drive Claremont,NC 28610 Arrival Time: 1:15:00 PM System AX ID: AX-140199 Departure Time. 2:05:00 PM County: Catawba Permit No. Inspection and Maintenance Checklist-AX-RT with LPP or P-Manifold or D-BOX Septic Tank Inspection Tank At Site Tank 1 Tank 1 Inlet Readings Tank 2 Inlet Readings 0 Scum 2 Sludge Scum Sludge Tank 1 Outlet Readings Tank 1 Outlet Readings 0 Scum 8 Sludge Scum Sludge Clean Effluent Filter: Cleaned Check for Influent or Effluent Blockages. No Blockage Inspect Tank/Riser for Leaks: None Seen Control Panel Inspection Check Pump Operates In Manual Mode: Yes Recirculation Pumps Recirculation Pump 1 Pump 1 Timer Settings Pump 1-Counters and Elapsed Time Meters 0.8 Dose 10 Rest 95245 CT 2845.6 ETM Dose Pumps Pump 1 Timer Settings Pump 1-Counters and Elapsed lime Meters Demand Dose Demand Rest 128 CT 7.6 ETM Verify Conduit Seal. Verified AX-RT Treatment Pod Inspection • Inspect for Ponding or Bridging. None Check and Record PSI: 5 Verify Orifice Position and Assess for Clogging: Cleaned Check for Odors None Clean,Brush,Flush Lateral: Done Recheck and Record PSI 5 Flush Pod Throroughly: Done Inspect and Clean Vents: Cleaned Inspection and Maintenance Checklist-AX-RT with LPP or P-Manifold or DBOX Recirculation Chamber Inspection Verify Inlet Flow: No Inflow aLAk - 0ri ) i��( AOWA The clear leader. AQWA Inc. 2604 Willis Court,Wilson, NC 27896 Phone: 252-243-7693—Email: aqwatammysanders@gmail.com Customer Name: Herrin Date of Inspection: 9/29/2025 Address: Herrin-4104 Wilkerson Drive Claremont,NC 28610 Arrival Time: 9:22:00 AM System AX ID: AX-140199 Departure Time: 10:46:00 AM County: Catawba Permit No. Inspection and Maintenance Checklist-AX-RT with LPP or P-Manifold or D-BOX Septic Tank Inspection Tank At Site Tank 1 Tank 1 Inlet Readings Tank 2 Inlet Readings 0 Scum 3 Sludge Scum Sludge Tank 1 Outlet Readings Tank 1 Outlet Readings 0 Scum 0 Sludge Scum Sludge Tank Inspection Questions Tank 1 Tank 2 Clean Effluent Filter: Cleaned Check for Influent or Effluent Blockages: No Blockage Inspect Tank/Riser for Leaks: None Seen Control Panel Inspection Check Pump Operates In Manual Mode: Yes Recirculation Pumps Recirculation Pump 1 Pump 1 Timer Settings Pump 1-Counters and Elapsed Time Meters 0.8 Dose 20 Rest 61505 CT 3539 ETM Dose Pumps Pump 1 Timer Settings Pump 1-Counters and Elapsed Time Meters Demand Dose Demand Rest 18.2 CT 303 ETM Verify Conduit Seal: Verified AX-RT Treatment Pod Inspection Pod Inspection Pod 1 Inspect for Ponding or Bridging: None Check and Record PSI: Verify Orifice Position and Assess for Clogging: Cleaned Check for Odors: None Clean,Brush,Flush Lateral: Done Recheck and Record PSI Flush Pod Throroughly: Done Inspect and Clean Vents: Vents Clear Inspection and Maintenance Checklist-AX-RT with LPP or P-Manifold or DBOX Recirculation Chamber Inspection Verify Inlet Flow: No Inflow Inspect Liquid: Low Level Record Scum/Sludge Levels: Inlet Readings: Outlet Readings: 0 Scum 0 Sludge 0 Scum 0 Sludge Inspect Tank/Riser for Leakage: None Seen Verify All Floats Work: Operating Properly Pump Sludge to Septic Tank: Not Needed Verify Audible Alarm Works for High Water float: Works Properly Pull Pump and Clean Screen: Cleaned Verify Neat Wrap of Float and Pump Cords: Checked Verify No Leaking In Piping or Flex Hoses: None Seen Verify Conduit Seal: Vented Ultraviolet Disinfection Unit Inspection Does System Have a UV? Yes How Many UV Disinfectant Units Present? UV 1 , a,r r- �n!€,..,w tia'4, `��#S.. .t..� a't '# - �.,x,. _.. _.� ,.;. After Disconnecting Power,Clean or Replace Bulb As Needed: Replaced Flush Housing Thoroughly: Flushed Return Power and Verify Proper Function: Verified Dosing Chamber Inspection Inspect for Tank/Riser Leakage: None Seen Turbidity Reading: 0.00 Inspect Liquid: Normal Level Record Scum/Sludge Levels: Inlet Readings: Outlet Readings: Scum Sludge 0 Scum 0 Sludge Visually Check Liquid Level: Normal Verify Audible Alarm Works for High Water float: Works Properly Verify No Leaks In Piping or Flex Hoses: None Seen Verify Neat Wrap of Float and Pump Cords: Checked Inspect Pump Intake: Ok Delivery Rate at Start Up: 21 Verify All Floats Work: Operating Properly Verify Conduit Seal: Vented LPP or P-Manifold or DBOX Inspection Areas Mowed and Clear of Obst action: Yes Flush Laterals: Not a LPP Area Free of Ponding or Surface Effluent: Yes Set and Record Head Pressure: N/A Curtain Drains,Ditches,Swales Functioning Prope ly: Yes Check Hardware: Functioning Properly Current Delivery Rate: 19.8 Pump Efficiency: 94 Return Valves and Control Panel to proper settings Done Control Panel Communication Checked: Panel called in. Inspection Notes 36-45=9x4.4=39.6-2=19.8 TR changed recirc rest to 20.0 due to low usage. Paul Smith Operator Operators Signature