Loading...
HomeMy WebLinkAboutBurgin Sediment Report 9-9-09.pdf SEDIMENTATION INSPECTION REPORT CATAWBA COUNTY UTILITIES & ENGINEERING DEPARTMENT PO Box 389, Newton, NC 28658 (828) 465-8161 FAX (828) 465-8392 Project Grading Project Number EVO2009-00001 Person Financially Responsible Burgin-hickory Properties Address PO Box 2610 Hickory, NC 28603 1. Project Location Mcdonald Pkwy Se Hickory Pictures: Prints Slides Digital Video 2. Weather and Soil Conditions Workable 3. Is site currently under notice of violation? Yes No If no, check violations below: 5. Violations (refer to Catawba County Local Ordinance Chapter 31): a. No approved plan 31-4 ( c ) g. Inadequate buffer zone 31-5 (a) (1) b. Failure to follow approved plan 31-5 (f) h. Graded slopes and fills too steep 31-5 (b) c. Failure to submit revised plan 31-6 (m) i. Unprotected exposed slopes 31-5 (b) d. Failure to provide adequate groundcover 31-5 (d) j. Failure to maintain erosion control measures 31-13 e. Insufficient measures to retain sediment on site 31-7 (e) k. Notice of activity initiation 31-6 (j) f. Failure to take all reasonable measures 31-4 (d) l. Other (describe): 6. Phase of Grading a. rough grading complete b. final grading complete Description: 7. Potential NPDES Permit violation? Yes No Describe 8. Has sedimentation damage occurred? Yes If yes, where? (check all that apply) No Lake/natural watercourse on the tract Lake/natural watercourse off the tract Other property Road/walkway Description: Degree of damage: Slight Moderate Severe 9. Contact made with (name)Neil Grading -Justin Title Inspection report in case file due to no activity given or sent to Person Financially Responsible. Date given/sent: 9/9/09 10. Corrective actions needed: SILT FENCE TO BE INSTALLED ALONG WOODED SIDE OF PROPERTY. SEDIMENT TO BE REMOVED FROM DOT RIGHT OF WAY (ALONG INTERSTATE OFF RAMP). SEDIMENT POND # 2 HAS BEEN REMOVED ACCORDING TO GRADING CONTRACTOR -TO BE REPLACED WITH TWO PERMANENT BASINS (ASKED CONTRACTOR TO SEND ME DETAILS OF THIS). SEDIMENT BASIN # 3 NEEDS TO BE MAINTAINED WITH TEMPORARY STABALIZATION ON SLOPES. MAINTAIN AREA BETWEEN SEDIMENT BASIN # 2 AND # 3 WHERE RILLS ARE FORMING. REINFORCE ROCK DAMS AROUND BOTH RISERS AND INSTALL TEMPORARY STABALIZATION ON SLOPES. MAINTAIN AREA NEAR INLET TO PREVENT SEDIMENT FROM LEAVING SITE. STABALIZE ANY AREAS THAT HAVE FINAL GRADE. Submit an adequate sedimentation and erosion control plan for approval, covering all areas disturbed or to be disturbed. Submit a revised sedimentation and erosion control plan for approval for the following areas: Install all sedimentation and erosion control measures as shown on the approved plan, including but not limited to the following locations: Install temporary sediment traps, basins and rock dams and associated diversions as shown on the approved plan, including but not limited to the following locations: Install erosion and sediment control devices sufficient to retain sediment on the tract: Install adequate drop inlet protection as shown on the approved plan, including but not limited to the following locations: Provide adequate temporary or permanent ground cover on all graded slopes where rough or fine grading has been completed for 21 calendar days, including the following areas: Any area which will not be under construction Provide adequate permanent ground cover on all areas where development has been completed for 15 working or 90 calendar days, whichever is shorter (15 working or 60 calendar days, whichever is shorter, in High Quality Waters): Maintain all sedimentation and erosion control measures as specified in the approved plan and as required to prevent sedimentation damage including the following locations: 11. Comments: No activity since last inspection: Report by: Ronda Gomez Others present: DENER, Toni Norton, Kim Sue Date of inspection: 9/9/09 Time arriving at site: 1:50 Time leaving site: 2:15 cc: Neil Grading , ,